Project Number / Title Aqaba New Port Package 2 – Grain Terminal Expansion Aqaba - Jordan
Member(s) to be
Inspected :
C 37
Inspection for Steel Reinfrcement for the first 1.2 m and the surface preperation for the silo walls No. 36&37 to Conc. QY , m3 ↓
Description ,
By MID Construction Team Leader
& Related Documents Specifications Material Submittal Method Statement Material Inspection QA / QC Check list (Attached)
Survey : levels and coordinates Latest Drawings used Material submittal Const. equip. location Saftey Inspection:
Site Check list
Embedded Items Safety precautions Re-bars and Cover QA/ QC Check list (Attached)
I, the undersigned, certify that we have completed the works mentioned above in accordance with latest relevant drawings , specifications and
related instructions and will be ready for inspection ( Including QA/QC check list ) on :
Date: 30 6 2018 At Time 8:00 AM
Civil Engineer Mechanical Engineer Electrical Engineer Surveyor
Name: Ebrahim Abu Zaid Name: Ahmed Qasem Name: Ahmed Qasem Name: Ayman Al-Tobasi
Received by DC on 2018 At By
QA/QC
Q/C Civil Engineer Q/C Mechanical Engineer Q/C Electrical Engineer Q/C Architect
Name: Name: Name: Name:
The signatures on this inspection request DO NOT IN ANYWAY relieve the Construction Contractor from any of his Obligations under the Construction Contract