Inspection Request No. GT2-WIR-C-0123 Wall Steel Reinforcement

Inspection Req. Date 30 6 2018


HAIF Company – MID Contracting Joint Venture
Reference Inspection req.

Project Number / Title Aqaba New Port Package 2 – Grain Terminal Expansion Aqaba - Jordan

Owner Aqaba Development Corporation

Owner Representetive JVDAD

Contractor HAIF Company – MID Contracting Joint Venture

Work Area / Zone / … Sheds Yards Building Infrastructure

Work Discipline Civil ü Arch. Elect. Mech. Roads


Concrete Grade↓

Member(s) to be
Inspected :
C 37
Inspection for Steel Reinfrcement for the first 1.2 m and the surface preperation for the silo walls No. 36&37 to Conc. QY , m3 ↓
Description ,
By MID Construction Team Leader

allow start the slip form formwork . As per attached .


level(s) , grid
lines , …etc

Location Silos walls No. 36 & 37

Drawing(s): No./ Rev. GT2-JHM-SI-SD-ST-(009/01,010/01,011/01,012/01,013/01,014/01,015/01,016/01)

& Related Documents Specifications Material Submittal Method Statement Material Inspection QA / QC Check list (Attached)

Survey : levels and coordinates Latest Drawings used Material submittal Const. equip. location Saftey Inspection:
Site Check list
Embedded Items Safety precautions Re-bars and Cover QA/ QC Check list (Attached)

I, the undersigned, certify that we have completed the works mentioned above in accordance with latest relevant drawings , specifications and
related instructions and will be ready for inspection ( Including QA/QC check list ) on :
Date: 30 6 2018 At Time 8:00 AM
Civil Engineer Mechanical Engineer Electrical Engineer Surveyor

Name: Ebrahim Abu Zaid Name: Ahmed Qasem Name: Ahmed Qasem Name: Ayman Al-Tobasi

Signature: Signature: Signature: Signature:

Date: 30-06-2018 Date: 30-06-2018 Date: 30-06-2018 Date: 30-06-2018


DC

Received by DC on 2018 At By

QA/QC
Q/C Civil Engineer Q/C Mechanical Engineer Q/C Electrical Engineer Q/C Architect
Name: Name: Name: Name:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date:

Status: Status: Status: Status:


Comments:
QA/QC

To: M/s JVDAD in :


Kindly be informed that our construction & QA/QC teams have inspected the above works and found them ready to proceed . Attendee
below will join your representative during inspection ... For your kind action,
Time Of Inspection For JVDAD: Date:

Attendee Name & Sign. QA/ QC Team Leader

Inspected By Comments Signature & Name


By JVDAD - Site
Team

JVDAD Site Team

The signatures on this inspection request DO NOT IN ANYWAY relieve the Construction Contractor from any of his Obligations under the Construction Contract

Received , after inspection , by DC of MID Distribution ( By MID ) : Attachments:


MID DC

Name: Quantity Surveyor Planning and cost control Sketch

Date: Site Engineer QC Departement Site Survey Report for roads

Signature: Planning Engineer S/C