Project: North Vas - Vas Living (NOYA) Date: 05-July-23
Client: Aldar Properties PJSC IR Ref. No.: NY2.NY-BW-FIB-VP-ZZ-XX-WI-AR-05763
Contractor: Fibrex LLC Rev.: 0
Consultant: ARCADIS
·.• . SECTION A - DETAILS OF INSPECTION ,
Work Package Discipline
0--- Civil / Structural L::J Mechanical LJ OTHERS (Specify) LJ

Building
□ 0
□ □
Infrastructure Architectural Electrical

□ □
Interior Design Natural Gas

Public Realm
Early Works Land Scaping / Hardscape Telecommunication/ IT
Description of work to be inspected: (Attached high-lighted copy of relevant drawing)
Inspection for Aluminium fence in 4 Bedroom villa 84,86,87,88,89,90 Zone 2 Ground floor.as per attached highlited drawings.

Location: as per the attached drawing I


Relevant Drawing / Specs: NY2.NY-BW-FIB-VP-4BV-ZZ-SH-FC-1621 Rev 01
MSRA Ref: NY2.NY-BW-FIB-ZZ-ZZ-00-MS-AR-00020 Rev 0
Inspection Date: 06-July-23 Inspection Time: 10.00AM
Submitted by: Flbrex LLC Date: Time:
Received by: Arcadis Date: Time:
Associated Discipline Inspection & Approval (Contractor)
Inspection Comment Signature Date/Time
Civil & Survey 05-July-23

Mechnical
-
Electrical - -·---- -

Others (Aluminum)
jfo}�
SECTION B - CONFORMATION OF CONTRACTOR'S QA/QC INSPECTION.·
Confirmation of coordination & compliance with Specifications, approved drawings, Method Statement & Quality Control plan
Yes 0 No D Note: If 'NO', any de arture from the specification, approved drawings, Method statement and Quality
Control plan to recorded below
Non Conformity and/or reference to attached N#dnformi eport (NCR)# Date:
Signed by Contrator QA/QC Engineer: ,_ 23-Jun-23
-1:..S' CTION C - ENGINEER'S INSPECTION/COMMENTS:
Position Commnets Signature Date /Time

Inspector

--
Surveyor

- -
Material Engineer
--
Resident Engineer - --

Accepted I I Accepted as noted II Not Acceptable I I Photo Attached l J


Consultant Signature: Date Time:
Received By Contractor: Date Time:
Copy with Section A completed by Contractor to be submitted to Consultant by 16.00 hrs the day before planned timem of inspection
Original with Section B completed to be handed to Consultant prior to inspection
Ern,ineer to comolete Section C & return to Contractor
Checking & Approval by the Engineer shall not relieve the Contractor from his obligationto perform the work in accordance with the Copntract Documents, Requirement of
Safety & local Authority regualtiok
NORTH YAS-YAS LIVING (NOYA), ABU DHABI; UAE

I CHECK LIST - ALUMINIUM FENCE


I
SECTION OF WORK:
J�c- LOCATION:
Villa 84,86,87,88,89,90.
Checked Checked
ws
Stage Item by FIB by FIB Date
Arcadis
Site QC
>,
Q. 1. Approved Shop Drawing & Materials are being used .......-----
0 .._..../'
C C
ca o
.s �
<>:.;i 2. Survey setting out marked by the surveyor as per approved
shoo drawinq .../ �
0 i=
·;::
0.. APPROVAL TO PROCEED
z ..,,,-
0
� 3. Check for brackets fixation ✓
...J 4. Check for Levels of bracket .__.,.....-

� 5. Check for Anchors fixation


L,/
c_../

a. �
O 6. Check for Plumbness of fence assembly ...,
-----
ZQ c:::

j 3: 7. Check for Alignment of fence assembly


.._/ �
(!)
z 8. Check for paint touch up if required
1i:
::> .__/'
.._,,.,.-

,.,,�
0 9. Check for overall workmanship.
� ._,,.,.-
(.)
w
::x: APPROVAL TO PROCEED WITH THE NEXT TRADE
(.)

Signature

All comments have been checked/clarified by the consultant.


�� di V
[....-

Consultant Siqnature: date:


Arch. Comments:
1. Refer to review comments marked on the pages. x
2. Ensure review comments through approved shop drawings, material/ tech data
submissions are incorporated during installation works on site.
3. Contractor fully responsible for coordination with all other trades and sequence of works
on site.
4. Ensure approval to all materials intended to use at site inclusive fixing components.
5. A mock up/ prototype installation shall be conducted at a selected location on site
and inspected prior to proceeding with permanent installations.
PR/SAG/EG
HSE: Strict compliance with approved SWP for working at height. No safety shortcut allowed.
11.12.2022 Provide fulltime competent close work supervision. use fall protection and barricade below working area. CODE B.

18 Dec 2022
Revikumar P A
4 CLUSTER VILLA - (16 NOS) = 64 UNITS ZON
E - 08
6 CLUSTER VILLA - (20 NOS) = 120 UNITS 08
08 6

6
8 CLUSTER VILLA - (12 NOS) = 96 UNITS C:10

6.
08 5 ZON

087
.7 E-0

088
08 4

089
C:
10 CLUSTER VILLA - (14 NOS) = 140 UNITS 6

090
091
08 3

092
093
094
4 BED ROOM VILLA = 90 UNITS 08 2
C:6.

095
096
1 ZON
TOTAL VILLAS = 510 UNITS 7 E-1

097
098
4

099
100
C:4.

101
103

102
104
08

105
7 C

106
07 0

107
4 BED ROOM VILLA TYPES

108
:4.8

294
109
C:8.

293
07 9

110

292
291
C:10 8
07 8 4BR

290
289
ST = STANDARD TYPE

.5
4BR

288
07 7 4 :36 C:6.
ST

287
421:48
MI = MIRROR TYPE 33

120
10
07 6 .6 8

119
MI

118

286
4BR 4BR

117

285
07 5

116
MI 4BR
C:6.

284
434:35
:49

C:

115

283
114
07 4 499

282
422:47

113
9

281
112
4BR MI MI

111

280
0 3

279
ST 4B 4BR

278
07 72 ZON :34

277
4 R : 5

276
12 E-0 3 5 :
423 46 500 0 ST 4BR:6

275
1 ST
12 1 7 ZON

C:4.9
498 1 274

308
ST
4BR

307
4BR M I 4BR 4BR E-1

306
12 2 4 5

305
: 1 M B :33 :
424 45 501 1
:5 273

304
12 3 461 8 I R:3 ST 4BR

303
4 3

302
ST 1 6 :6
4 M
C:10 2

301
5
12 4 4BR 6 0 S ST B4 I 497 272

300
4BR T R 4BR

299
6.
462:17 ST 4B :32 425:44 :
502 52 ST .8

298
07 12 5 MI 4 271
R C:6.

297
: 4 3 B R

296
06 0 459 29 4 :

C:
7
6 496 63
ST MI 4

295
MI
06 9
4BR BR BR 4BR 10 C:

309
463:16
:43
C:10 4.10
:

310
MI 4B :3 5 3

311
R 438 0 4 26 503 ST 4BR
06 8

312
8. 458:27 4 :

313
495 64
12 4BR MI MI

314
ST
06 7 B 4BR
.9

315
R
C:
12 7 :
464 15
S T 4B S 4 :

316
6 :2 T B 5 4 M

317
06 R 439 8 R 504 I 4BR 270

C:6.12
427:42

318
12 8 457:25 4 ST :

319
494 65 4BR
ST
06 5 4BR MI

320
9 B

321
1 R M 4 : 269

322
06 4 30 :
465 14 M I 4BR : 2 I B 474 66

323
4
440 6 R 4 BR:5 ST 4BR

324
3 1 :23 :41 MI 268

6.
3
13 1 4BR M I 4 56 4BR S T 4 2 8 505 5 : 6
493 7 4BR
ST 4B
466:13
ST 4B : MI 267
C:
06 2 R 441 4 2 R 4 BR: : 68
06 2 455:21 4 429:40 MI 4BR: 475 ST ST 4BR:79
506 56 ST
ST
3

266
4BR 492 69 4BR
MI
BR
C:6.
473
-0

MI 4
06 1 :
467 12
M 4 442:22
I BR BR :70 265
.4

4
05 0 :1 : 3 B R S 4 B 4 11
NE

ZON 454 9 4 430 9 : T R: 7 6 M I 4BR


507 57

325
MI ST MI
4BR 491 71 4BR

326
:
472 80
10

05 9 E-0 BR

327
ST 4

328
ZO

468:11 : B

C:6.13
5 2 MI : 264

329
05 8 443 0 R : 4 7 2

330
431 8 3 B R: M 4
I BR:7 4 77
C:

ST ST 4BR
508 58 ST
MI ST 263
05 7 490 3 4BR :

C:4.11
471 81
142

MI 4B 331
141

05 6
140

ST 4B R : 4 : 7 4 262
139

4B 432 7 3 B R: ST BR 4 4 332
138

0 5 R 78 MI 4B
C:6. 453:09 4 R:10 509 59
137

:
489 75 4BR
MI R: 261
05 54 470 82
136

MI 333
C:8. 3
4 :
135

3 MI 4B 4 4 M 7 6
134

R 4B M B R: I 4BR 479 260

ZONE - 16
I
133
ST
C:4. 452:07 4 R:08 510 60 S :
488 77 4BR
MI 4B 334
6 R: ZONE - 12
143

05 469 83 259
144

4 T
6 5 :
145

05 2 ST 4B ST 78
146

R:0 4BR Z 480


147

C:4. ONE MI
148

05 1 451 5 4 :06
149

- 04
1

150

04 0 5 MI 4
BR
46 4 B 258

C:4.12 C:6.14
M S
8.

4B T R:
151

I ZON
04 9 450:03 4 R:04 487 84
152

257
153

E-1
C:

154
176

04 8 47 S 3 4BR
175

350
349
MI 4B ST 4BR

347
348
174

256

346
345
T :

344
ZON 481 85

343
04 7

342
173

341
R:0 4B : 8

340
339
338
6
172

337
336
335
E-0 449 2 R 486
71

04 6 448:01 MI 255
C:10
170

C:4. 2 BR:8 4BR:87 C:10.10


169

MI 4
1

168

5 ST
C:6.15 254
167

4 .3 485 8 482 ST
166
177

253
C:10.11
165

C:8. ZON
178

164
179

4
4 B
C:6.16
163

E-0 S B
180

T R: R
162

:8
4 48 90 48 9 S

351
352
181

161

354
353
001

355
9

356
C:8. 252

357
044

358
160

359
182

360
4 3

361
362
T
159
183

363
043

364
365
366
184
042

002
158

5
157
041

185

251
156
040

155
186
039

187

2
003
C:8.
038

188

250
C:4.3
037

C:10
C:6.
036

3 004
189

201
035

190

20
191
034

.2 249
192
033

C:4.2 005 202 ZONE - 11


193
032

194
031

392
367

391
030

195

368

389
390
388
369
203

387
370

386
006

C:6.
196
029

385
371

384
372

383
373

382
028

197

381
374

380
375

379
378
198

376

377
027

199
200

204
C:10
026

007
025

C:10.14 C:10.12

C:4.13
.1 008 205
C:6.17 248
024

206 C:4.15
023

C:8.9 C:10.13
022

009 247
C:6.18
021

1
020

420

393
419

394
019

418
010

396
395
417
246

397
398
416
C:6.

399
018

415
C:4.16

400
C:8.

401
414

402
413

403
412

404
017

411

405
207

406
410

407
408
ZON

409
016

011
015

2 245
014
013

E-0 012 208


1
C:4.1
CESS
CESS

209
NTS AC
RS AC

210
VISITO
RESIDE

244
243
211

241
242
240
212

239
238
213

237
214

236
215

235
216

233
234
232
217

231
230
218

229
219
220

228
221

227
226
222

225
223
224
C:6.19 C:8.10 C:8.11 C:8.12
C:4.14
ZONE - 10

NORTH YAS - YAS LIVING


MASTER KEY PLAN
1. Subject to structural approval for fixation.
2. For color and finish subject to material approval.
3. For installation subject to site mock up approval.

X
NU 03/06/22

All fixing plats


should hide below
landscape level

You might also like