You are on page 1of 2

THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-E-CL-0015-01


Contract No: 4600000433 Date of Inspection:
Contract Title: Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for Installation of Lighting Control System


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail

I. Seting Out

1 Check Approved Shop Drawings/Layout.

Check Method Statement for installation of lighting control


2
system is approved by The Engineer.
II. MEP/CIVIL
Check for Services Clearances; and the same approved by
1
The Engineer site team.

III. Installation of lighting control cable


Check that material used on site is as per approved
1
material submittal

Check that sizees of lighting control containment as per


2 approved shop drawings and manufecturer
recommendations

Check that lighting control containment is continuous and


3
connected to lighting control panel

Check that lighting control cable installed embedded in


2 PVC conduits or in tray/trunking as per approved shop
drawings.

Check that no lighting control Cables have been installed


4 directly in concrete, block work or brickwork, walls, floors
etc. without written approval of The Engineer.

Check that termination of cables has been carried out as


5
per manufacturer's instructions.
Check that conduits are connected to lighting control
6
containment probably.
Check that insulation resistance tests have been carried
7
before jointing.
IV. Installation of lighting control Panel

1 Installation of devices in lighting control panels

2 Proper identification of cables

3 Proper termination of data cables

4 Proper termination of power cables

V. Installation of Field Devices

1 Installation of sensors

2 Installation of non display switches

3 Installation of display switches

4 Installation of touchscreens

Page 1 of 2
THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-E-CL-0015-01


Contract No: 4600000433 Date of Inspection:
Contract Title: Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for Installation of Lighting Control System


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail
Comments: Comments:

Subcontractor Representative TAL JV QC Engineer / Inspector


Name: Name:

Position: Position:
Signature: Signature:
Date: Date:
Comments:

THE ENGINEER's Representative


Name:
Position:
Signature:
Date:

Page 2 of 2