You are on page 1of 2

THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-M-CL-0008-01


Contract No: 4600000433 Date of Inspection:
Contract Title: SAEI Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for HVAC Piping Insulation


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail

I. Document submittal
HVAC piping insulation material including pipe
1 insulation, adhesives, sealants, paints, securements
and identifications, is approved by the Engineer

2 Method of statement is approved by the Engineer

Shop drawings are available with approval from the


3
Engineer
II. SITE DELIVERY AND STORAGE
Delivered insulation material including pipe insulation,
adhesives, sealants, paints, securements and
1
identifications are QC inspected and approved from the
Engineer.

Insulation material is handled and stored properly


2
according to the manufacturer's recommendation.

III. Construction

Insulation type is as per the approved schedule (cellular


1
glass or elastomeric)

The insulation thickness, facing, model and density are


2
in accordance with the specification

3 Surface preparation is done properly

Adhesive application is done according to method of


4
statement

5 Sealants are applied properly

6 Gaps and protursions are filled properly with sealant

The insulation is properly fitted and secured to the


7
pipes and all joints are closely butted and sealed

The insulation is done properly at all hangers, suppots,


8
valvesand specialties

All vapor barriers are the correct type, thickness,


9
continuous and complete

Insulation finish (paint) is applied properly, uniform and


10
free of defects

11 Pipe labels are installed properly as required

Page 1 of 2
THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-M-CL-0008-01


Contract No: 4600000433 Date of Inspection:
Contract Title: SAEI Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for HVAC Piping Insulation


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail
Comments: Comments:

Subcontractor Representative TAL JV QC Engineer / Inspector


Name: Name:
Position: Position:
Signature: Signature:
Date: Date:
Comments:

THE ENGINEER's Representative


Name:
Position:
Signature:
Date:

Page 2 of 2