You are on page 1of 1

THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-TAL-DAR-E-CL-0014-01


Contract No: 4600000433 Date of Inspection:
Contract Title: Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist For Identification of Electrical Systems

Work Location:

Subcontractor TAL JV Engineer


QC Representative Inspector / Engineer Inspector / Engineer
DESCRIPTION Remark(s)
Pass Fail Pass Fail Pass Fail

I. Setting out

Shop drawings/Layout/Panel Schedules are approved by the


1
Engineer

Method Statement for Identification for electrical systems is


2
approved by the Engineer

II. Material Delivery

Delivered material (Identification tags / labels / markings) to


1
site is QC inspected and received approval from the Engineer.

III. Identification For Electrical Systems


Ensure that the material installed are as per approved material
1
submittal
Ensure that the installation are as per approved shop drawing
2
& coordinated drawings

3 Ensure that all disconnects must have specific identification

Identification of cables shall include the cable number and


4
destination
Ensure that the label on the cabinet front cover is as per
5
approved equipment Schedule.

6 Ensure that confirm amps and volts are identified on label

Individual control cables shall be identified by lables at each


7
end
Ensure identification of product name and type of cabinet from
8
label

Comments: Comments:

Subcontractor Representative TAL JV QC Engineer / Inspector


Name: Name:

Position: Position:
Signature: Signature:
Date: Date:
Comments:

THE ENGINEER's Representative


Name:
Position:
Signature:
Date:

Page 1 of 1