RESIDENCE LAGOS PROJECT

No. 11 QUEENS DRIVE, IKOYI LAGOS, NIGERIA


Item No.
INSPECTION REQUEST (IR)
Insp. Req. No. LEM-RED-IR-M-034
DETAILS OF INSPECTION SECTION A
ALL INSPECTION REQUESTS SHOULD BE SUBMIITED TO DM BY 14.00 HRS THE DAY BEFORE THE PLANNED INSPECTION
Dredging & Reclamation Marine & Seawall Canal Bridges Earth Works & Sewers
Roads & Utilities Structural/Civil Masonry/Plaster Architectural IT Survey
Mechanical Electrical District Cooling Lifts Others

Description of Works to be Inspected (Attach highlighted copy of the relevant drawing)

Inspection Request for the installation of Openings on slaps and Sleeves in Drop Beams on First Floor Level for mechanical
services as per attached drawing.

Relevant Drawings Nos.: First Floor Layout TRV-SD-EM-FF-BW-ME-001-01


Inspection Date: 11/06/2020 Inspection Time: 9:00 a.m
Submitted by: Akagwu Emmanuel Date: 09/06/2020 Time: 9:00 a.m
Received by: Date: Time:

Location: Within Gridline: (E-H)(5-7)


System:
Builders Work

INSPECTION COMMENT
Position Comments Signature Date & Time
Architectural

Civil & Structural

MEP

Others (Specify)
CONFIRMATION OF CONTRACTOR'S QA/QC INSPECTION SECTION B
Confirmation of coordination and compliance with the specifications, approved drawings, Method Statement, and Quality Control Plan
If No, any departure from the specification, approved drawings, Method of Statement and Quality Control Plan
Yes No Note:
to be recorded below
Non conformity and/or reference to the attached Non Conformity Report (NCR) NCR No. Date:
Signed by Contractors QA/QC Manager: Date:
ENGINEERS INSPECTION COMMENTS: SECTION C
POSITION Comments Signature Date & Time

Architectural

Civil & Structural

MEP

Others (Specify)

NOT APPROVED APPROVED WITH COMMENTS APPROVED


Date:
CONSULTANT Signature: Time:

Client Representative SECTION D


Date:
Client's Signature: Time:

Section A to be completed by MEP Contractor and delivered to CRANEBURG by at least 24 hrs. before planned time of inspection.
Section B to be completed by CRANEBURG prior to inspection.
Section C to be completed by MEP CONSULTANT and delivered to Contractor.
Section D to be completed by Client representative the original copy.
Checking technical compliance by the Consultant shall not relieve the Contractor from his obligation to perform the work in accordance with the
Contract Documents, Requirements of Safety, and Local Authorities regulations.

Form Ref: LDPNG_HP_CIRF_Rev. 00