You are on page 1of 1

Works Inspection Request - WIR

WIR Serial Number: NCH-TAM-AH-000-DOC-WIR-0048

Program Title Developmental Housing Project of MOH WAVE #2

Project Title Al-Hasa Housing Project


Client National Housing Company
PM Saudi Arabian Parsons Ltd.-SAPL
Engineer Al OMRAN Architects & Engineering Consultants
Contractor: Tamimi Global Company
Part A: By the Contractor:
Description of Works to be inspected and / or tested: Date of Submission:20/11/2019
Time of Submission:9:30 AM
Electrical Sleeves Inspection for Raft Foundation Discipline:
Civil
Architectural
Mechanical
Works Location: Electrical
PLOT NO# 2A-94/132-133 Units Other (state)

Works Quantity:
-

Sketch attached to show the location(s) Yes No


Attached Test Certificates Yes No

Other Sections' Comments & Sign-off:


Section Name Date Designation Signature Comment's If Any
Survey Section
Interface (MEP Section)
Interface(Others………...)

Site Engineer: Ready for QA/QC Engineer


inspection and/or testing on: Date: Time: Signed by:
QA/QC Engineer Comments:

QA/QC Engineer: Ready for Engineer's


inspection and/or testing on: Date: Time: Signed by:
Part B: By the Engineer:
Received by Engineer on: Date: Time: Signed by:
Site Inspector's Comments:

Name: Signature: Designation: Date: Time:


Surveyor's Comments:

Name: Signature: Designation: Date: Time:

Witnessed Site Test Results (if any): Passed

Failed

Ref: Report No: Witnessed By (Signature): N/A

Engineer's Final Comments & Decision: The Work is:


Approved Remarks:
Approved as Noted

Rejected

Engineer : Signature: Date:

Contractor: Signature: Date: