Program Title Developmental Housing Project of MOH WAVE #2
Project Title Al-Hasa Housing Project
Client National Housing Company PM Saudi Arabian Parsons Ltd.-SAPL Engineer Al OMRAN Architects & Engineering Consultants Contractor: Tamimi Global Company Part A: By the Contractor: Description of Works to be inspected and / or tested: Date of Submission:20/11/2019 Time of Submission:9:30 AM Electrical Sleeves Inspection for Raft Foundation Discipline: Civil Architectural Mechanical Works Location: Electrical PLOT NO# 2A-94/132-133 Units Other (state)
Works Quantity: -
Sketch attached to show the location(s) Yes No
Attached Test Certificates Yes No
Other Sections' Comments & Sign-off:
Section Name Date Designation Signature Comment's If Any Survey Section Interface (MEP Section) Interface(Others………...)
Site Engineer: Ready for QA/QC Engineer
inspection and/or testing on: Date: Time: Signed by: QA/QC Engineer Comments:
QA/QC Engineer: Ready for Engineer's
inspection and/or testing on: Date: Time: Signed by: Part B: By the Engineer: Received by Engineer on: Date: Time: Signed by: Site Inspector's Comments:
Name: Signature: Designation: Date: Time:
Surveyor's Comments:
Name: Signature: Designation: Date: Time:
Witnessed Site Test Results (if any): Passed
Failed
Ref: Report No: Witnessed By (Signature): N/A
Engineer's Final Comments & Decision: The Work is: