Post Concrete Placement Inspection Sheet

Date: Sheet No.:


Project: Location:
Employer:
Contractor:
Consultant:
Structure type and level:
Structure label:
Concrete grade:
Parameters Yes/Good No/Poor Notes
Observation of honeycombing
Level of concrete as per drawing
Surface finish as per spec.
Cracks and air bubbles
Adequacy of vibration as per spec.
Curing of concrete
Removal of temp. ties & spacers
Thermal cracks and shrinkage
Repair defects as per spec.
Continuity of operations

NB: The contractor must issue internal approval


documents if and when such a document is requested by
the consultant
Additional Items/Comments:

Following the request for inspection, the works as per the above listed items and supportive documents have
been evaluated and permission to proceed is hereby Granted / Refused 

Contractor Consultant Project Manager


Name

Signature