Professional Documents
Culture Documents
Classification of Non-conformance
Design Manufacturing Contractual Damage
Workmanship Quality Construction Material
Other (specify)
Details of Non-
conformance
Cause of NCR determined (if Yes No
yes describe ) sfggssg
Correction of NCR
Action by:
Completion date
Approved by:
Coments
Non-conformity closure
NCR correction checked by: Date:
NCR correction approved by: Date: