Professional Documents
Culture Documents
Essential Information
Date of test:
Sampling: Time: Place:
Sampling method: ☐ General - BS 1881: Part 101
Or alternative – ☐ BS 1881: Part 102, Clause 4.2
Sample identity number:
Sampling certificate available (copy attached): Yes No
Slump: Time of test: Place:
Time from sampling to beginning of test:
Form of slump: ☐ true ☐ shear ☐ collapse
Measured true slump:
Name of tester:
Additional Information
Name of project:
Part of works where concrete used:
Name of supplier:
Source of concrete:
Time of production or delivery to site:
Specification of concrete mix (e.g. strength class):
Affirmation that the test was made in accordance with BS 1881: Part 102 or BS EN 12350-2 as indicated above