Plastering Checklist Checklist No.

Name of Work :
Date / Time
Item Description :
Inspection Requested By

Drawing Reference
Block Floor Flat No
1st Coat 2nd Coat

Points to Check O/P Action Required O/P Action Required


1 Drawings & Spec. Details Finalised

Material Approvals
2
Completion of Masonry in all respect
3
Doors & Window frames fixed as req.
4
All Services lines laid and approved
Pre Plaster Checklist

5
Hacking of related RCC Surfaces
6
Racking of Masonry Joints
7
Fixing of Wire mesh at interfaces
8
Button Marks fixed around walls
9
Old mortar flakes removal & cleaning
10
Availability of adaquate lighting
11
Wetting of base masonry surface
12
Stability of Scaffolding / frame work
13

1 Line, level & Verticality

2 Plastering Pattern laid as per Drg.

3 Surface finish & evenness


After Plastering

4 Making of grooves as specified if any

5 Thickness of Grooves & Evenness

6 Cleaning of Joints & Corners finishing

7 Provision for skirting

8 Cleaning of Splashing in adj. surface

9 Rough finish for Cladding area if any

10 Curing as specified
Work Approval □ Approved □ Approved to subject of rectifications □ Not Approved

Approval Date Task End Date


Remarks

Contractor Sign Project Engineer Sign Project Manager