PLASTERING WORK CHECKLIST Checklist No
Name of Work Date / Time
Item Description Inspection Requested by
Block Floor Flat No
1st Coat 2nd Coat
Points to Check
O/P Action Required O/P Action Required
1 Completion of masonry in all respect
2 Doors & Window frames are fixed as requested
3 All service lines are laid and approved
Pre-plaster Checklist
4 Hacking of related RCC Surfaces done
5 Racking of masonry joints
6 Fixing of wire mesh at interfaces
7 Button Marks fixed around walls
8 Old mortar flakes removal & cleaning
9 Availability of adequate lighting
10 Wetting of base masonry surface
11 Stability of scaffolding and framework
1 Line, Level & Verticality
2 Plastering pattern laid as per drawing
After Plastering Checklist
3 Surface finish & evenness
4 Cleaning of Joints & Corner finishing
5 Provision for skirting
6 Cleaning of splashing in adjacent surface
7 Rough finish for cladding area (If any)
8 Curing as specified
Work Approval □ Approved □ Approved to subject to rec fica ons □ Not Approved
Approval Date
Task End Date
Remarks