Project Quality Plan (PQP)

Project No. 19 Project Name Project detail/ Location

Check list for Final Coat Painting (External)


Location: Sheet No.

S. No. Points to be verified Yes No N/A Remarks


1
Approval of painting system, colour/texture received

2 Is the surface to be painted dry


3 Sequence of painting is correctly followed as per the
manufacturer recommendations
4 Electrical fixtures/ doors & windows/ floor tiling etc are
5 protected
Cracks onfrom dirtyingare
the surface during
filledand
withafter painting
proper filler
7 Sealing of wood knots in door frames is done
8 Rusted metal surfaces are properly treated and approved
paint system is applied
9 Co-ordination with M & E services carried out as per the
check list
Other special requirements/Remarks:

NAME SIGNATURE DATE


Site Engineer
MEP Engineer
Project Engineer
Project Manager
HSEQ
QA/QC Incharge