Civil4M Solutions LLP

Forum Project

Dado Wall Tiling Work

Name of Structure : Date :

Reference Drawings : Location:

Sr. Particulars Yes / No / Remarks


No. N.A.

Pre Execution Checks:


1 The surface on which tiles are to be laid is moist, free from dust
and other contaminations.
2 The tile name and tile code number to be used for that particular
area of work is correct.
3 Are all tiles according to required dimensions?
4 Are there any chipped tile being used for tiling?
5 Tiles of different boxes of same batch are mixed to ensure
uniform tonality.
6 Ceramic tiles cured before placing when cement mortar is being
used for tiling.
During Execution Checks:
1 Is correct laying procedure followed (like leveling using rubber
hammer and checking with spirit level etc).
2 Is the spacing of tile maintained using specified PVC spacer.
3 Cleaning of joints from loose mortar done immediately after tile
laying.
4 Are PVC beads in plumb and in line with wall tiles?
5 Is the PVC bead laid in a single piece and cut to 45 degree
inclination at the joints?
6 The circular cutting in tile for the pipes have been properly done.
7 Is flexible tile adhesive used in case of under-tile waterproofing?
8 Is tile adhesive applied using appropriate notch trowel.
9 Are tiles being laid before adhesive starts to dry.
10 Wet tile adhesive cleaned off from the tile surface using damp
cloth.
11 Checking of tiles by tapping gently done after laying on the
mortar bed for settlement.
12 Tiles around the Bath Tub fixed in level, with gap for silicon filling
and proper slope.
13 Skinwalls tiles properly – corner spacing ensured, tile beading
and joining unpleasant right angles to the main wall ensured.
14 Tile adhesive applied to back of the tile to accommodate required
levels.
Post Execution Checks:
1 Are the joints of the tiles properly aligned?
2 Hollow sound heard while tapping the tiles.

https://civil4m.com
Civil4M Solutions LLP
Forum Project

3 The tile surface properly aligned and in plumb.


4 Right angles at the corners of tiled surface ensured.
5 Barricading of tiled area suitably done.
6 Floor tiling covered with low quality POP.
7 The tile edges found to be straight.
8 Grouting of tiles completed with approved color of grout.

Conclusion by Civil4M Representative - Activities Are Satisfactory / Not satisfactory

Contractor's Representative Civil4M Representative

Signature Signature