Quality Assurance & Quality Control - Preparation of Quality Management Plan

ARNA INFRA MATERIAL TESTING PLAN


NAME OF THE PROJECT False Ceiling Works of Proposed "Phoenix H10"buliding at Hitech City, Hyderabad. No.of Items 4 Total Pages
PROJECT CONTRACT CODE LE170917 PAGE NO. 1
NAME OF THE DOCUMENT Material Testing Plan of Quality Management Plan 0 2
SPECIFICATION
TEST (CONTRACT CL.) /
SR. NO. MATERIAL ACCEPTANCE CRITERIA FREQUENCY WHETHER IN-HOUSE OR 3RD PARTY TESTING
REQUIRED RELEVANT I.S.
CODES
1 False Ceiling
Physical &
Chemical IS 2095 (Part 1) : 2011 IS 2095 (Part 1) : 2011 Once at the start of the activity or Change of source 3rd party
properties
2 MR Grid Ceiling
Physical &
Chemical IS 2095 (Part 1) : 2011 IS 2095 (Part 1) : 2011 Once at the start of the activity or Change of source 3rd party
properties
3 Bision Grid Ceiling
Physical &
Chemical IS 2095 (Part 1) : 2011 IS 2095 (Part 1) : 2011 Once at the start of the activity or Change of source 3rd party
properties

Prepared By: Reviewed By: Reviewed By:


QA/QC Manager/Engineer Project In-Charge Regional QA/QC Head