Quality Assurance & Quality Control - Preparation of Quality Management Plan
ARNA INFRA MATERIAL TESTING PLAN
NAME OF THE PROJECT False Ceiling Works of Proposed "Phoenix H10"buliding at Hitech City, Hyderabad. No.of Items 4 Total Pages PROJECT CONTRACT CODE LE170917 PAGE NO. 1 NAME OF THE DOCUMENT Material Testing Plan of Quality Management Plan 0 2 SPECIFICATION TEST (CONTRACT CL.) / SR. NO. MATERIAL ACCEPTANCE CRITERIA FREQUENCY WHETHER IN-HOUSE OR 3RD PARTY TESTING REQUIRED RELEVANT I.S. CODES 1 False Ceiling Physical & Chemical IS 2095 (Part 1) : 2011 IS 2095 (Part 1) : 2011 Once at the start of the activity or Change of source 3rd party properties 2 MR Grid Ceiling Physical & Chemical IS 2095 (Part 1) : 2011 IS 2095 (Part 1) : 2011 Once at the start of the activity or Change of source 3rd party properties 3 Bision Grid Ceiling Physical & Chemical IS 2095 (Part 1) : 2011 IS 2095 (Part 1) : 2011 Once at the start of the activity or Change of source 3rd party properties
Prepared By: Reviewed By: Reviewed By:
QA/QC Manager/Engineer Project In-Charge Regional QA/QC Head