CHECKLIST FOR TILES FLOORING

Project: Tiles Flooring Works of Proposed "Phoenix H10"buliding at Hitech City, Hyderabad.
Name of Project : Phoenix H10buliding at Hitech City, Hyderabad
Date of Checking :-
Location :-
Drawing/ Document Reference No :-
PRIOR TO Screed for Floor Tiling Work
Sl.No. Description/ Activities/Items to be Checked Status
1 MEP mep clearance Sign Off
2 The surface on which screed to be laid made moist, free from dust and
other contaminations.
3 Are there any undulations observed in surface level?
4 Button marks / height indicators fixed properly.
5 Side runners have been placed as per requirements.
6 Screeding is carried out in presence of Engineer.
7 The sequence of concreting well planned and sufficient labours
8 deployed.
The screed for floor tiling done as per the slope and level requirements.
9 Checking of the level of finish for the tiles done when the screed is
fresh, so as to make necessary corrections.
10 Uniform compaction with straight edge / flat shovel has been ensured.
PRIOR Execution Checks: Floor tiling work
Sl.No. Item description Status
1 Are all the required tools available at site?
2 The surface on which tiles to be laid made moist, free from dust and
other contaminations.
3 The plan / setting out for tiling done.
4 All the tiles are of required dimensions.
5 Chipped tiles not used for flooring.
6 Button marks established for tiling.
7 Tiles of different boxes of same batched mixed to ensure uniform
8 tonality.
Required number of tiles available at the site.
9 Ceramic tiles cured before placing when fixing done using cement
10 mortar.
Ceramic tiles cured before placing when fixing done using adhesive.
11 The tile code number and tile name ensure by the Tile in-charge.
During Execution
1 Is correct laying procedure followed (like leveling using rubber hammer
and checking with spirit level etc).
2 Cleaning of joints from loose mortar done immediately after tile laying.
3 Screed for floor tiling laid as per required slope and level (in wet areas).
4 Slope of the tile is give as per the specifications (in wet areas).
5 The corners of the tiled surface are at right angle to each other.
6 The tiles have been disturbed before the tile adhesive has dried.
7 Tile adhesive removed from the surface of tile using a damp cloth while
the tile adhesive is still wet.
8 Are the tiles are gently tapped after laying on the mortar bed for the
better settlement.
9 Check for matching of joints, closure of gaps & uniform finish

Post Completion
Sl.No. Item description Status
1 Grouting done 24 hours after tiling.
2 Are the joints of tiles properly aligned?
3 The joints are cleaned to remove the loose mortar.
4 Any hollo sound heard while tapping the tiles.
5 The tiled surface properly aligned and provided with required slope.
6 Right angles ensured at the corners of tiled surface.
7 Barricading of the tiled area done.
8 All the floor tiles covered with LDPE sheets.
Observations if any: Yes No
 Signaitures / Name with date
Vendor ( M/s. Arna Infra L&T- GC Site ( Finishing Engineer) L&T ( QA/QC) Client/ Consultant
Solution)
Name:
Signaitures
Date:
Time: