ACTIVITY CHECKLISTS
Date :
Checklist for PCC
WIR No. :
Project :
Dwg Name :
Zone/Stretch Location : Dwg No. & Revision :
Status (Tick mark on applicable
SL. cell)
No.
Checking Points Comments
Yes No NA
General items checklist Where applicable to this section.
1 Approved Shop drawing available
2 Method Statement available
3 MAR/MIR available
4 Availability of all the latest relevant GFC drawings.
5 Make sure that all loose material of excavated surface is cleaned
6 Availability of measurement batch boxes on site.
7 Concreting carried out in the presence of an engineer
Proper lighting arrangement made for concreting during night
8
time.
9 Availability of all required tools for concreting on site.
10 Availability of sufficient manpower for concreting on site.
Suitable vibrator, fuel and vibrator needles employed for
11
different members of a structure.
Checking of vibrators done before concreting for thickness of
12
concrete more than 150mm
13 Are pumps of suitable capacity provided on the site.
14 Slush removed properly before the start of work?
15 Antitermite treatment done before laying the PCC.
16 Bull mark/ height indicators fixed properly
17 Side runners/ formwork placed as required with proper supports
Is curing by sprinkling of water started as soon as the surface
18
starts drying?
19 Level of finish checked and concreted when concrete is fresh.
Post Checking
Concrete Strength Sufficiently strong before removal of forms and
20 surfaces are not damaged or spalled by too early removal.
21 Any Honeycomb observed
22 Any undulation surface observed
702037774.xlsx Page 1
ACTIVITY CHECKLISTS
Project-Specific Items:
Comments:
Vendor Name:
Date:
Vendor Rep Signature :
Inspected. OK to proceed.
Date:
SYN Rep:
702037774.xlsx Page 2