This checklist is for quality checks during block masonry work on a project. It outlines pre-work checks like ensuring proper drawings and materials are available, mid-work checks like verifying proper mortar mixing and wall alignment, and post-work checks such as curing and cleanup. The checklist will be used by contractors, site engineers, quality engineers, and project managers to ensure block masonry work meets specifications.
This checklist is for quality checks during block masonry work on a project. It outlines pre-work checks like ensuring proper drawings and materials are available, mid-work checks like verifying proper mortar mixing and wall alignment, and post-work checks such as curing and cleanup. The checklist will be used by contractors, site engineers, quality engineers, and project managers to ensure block masonry work meets specifications.
This checklist is for quality checks during block masonry work on a project. It outlines pre-work checks like ensuring proper drawings and materials are available, mid-work checks like verifying proper mortar mixing and wall alignment, and post-work checks such as curing and cleanup. The checklist will be used by contractors, site engineers, quality engineers, and project managers to ensure block masonry work meets specifications.
NO YES/NO A PRE CHECKS 1 Approved architectural drawing (AFC) available. 2 Change, Modification, Alteration checked. 3 All blocks are as per required dimensions. 4 Grinding work and tie rod holes fixing by GP2 chemical should be done. 5 Beam bulging issues should be solved as per methodology. 6 Electrical conduit and firefighting sleeves opening should be done. 7 Check hacking of columns/beams is completed. 8 Location for masonry is clean. 9 Layout done by solid blocks (where ever applicable). 10 All blocks surface moist. 11 Mortar (Conventional/Ready mix) material available. 12 Mason having all necessary tools B DURING EXECUTION CHECKS 13 Masonry surfaces is wet and free from dust. 14 Lineout of room walls, inner dimension, right angle of rooms checked 15 Mortar mix/ Ready mix proportion- checked. 16 All layers are in uniform level. 17 Opening size & location checked. 18 Concrete band/ provision of bars in partition wall checked. (If Required). 19 Ensure mortar is being used completely within 90 minutes after mixing. 20 RCC band is provided as specified at every 1m height as required. 21 Anchorage for lintels are adequate as specified. C POST CHECKS 22 Curing arrangements checked 23 Plumb of walls & line of wall should be checked. 24 Block/Brick masonry completed up to 1m height in one day activity. 25 Last layer tied in the next day. 26 Block work date should be mention. 27 Surrounding area should be cleaned.
CONTRACTOR- SITE ENGINEER- QA/QC ENGINEER- PROJECT MANAGER-