2
METHOD STATEMENT -10 URINAL PARTITION WORK
INDEX
1 COVER SHEET 1
2 INDEX 2
3 GENERAL REQUIREMENTS 3
4 SCOPE OF WORK 3
5 REFERENCE DOCUMENTS 3
6 MATERIALS 3
The purpose of method statement is to describe the sequence and methodology for Urinal
partition works of Godrej Fund Management Building at Indranagar, Bangalore.
4. SCOPE OF WORK
Supply, install and finishing finish the Urinal partition in accordance with specification as
shown on the drawings of Godrej Fund Management Building at Indranagar, Bangalore.
5. REFERENCE DOCUMENTS
6. MATERIALS
Stack all the Toughened Glass on a dry & covered place, sheltered from rain.
The maximum number of Glass that can be stacked is 20.
Materials received at site shall be checked for the following defects prior to its
acceptance:
a. Tile of same type but distinctly different colour or texture to be rejected
immediately.
b. Tile should be free from holes seams, shakes, pockets, stains and other unwanted
effects.
c. Thickness tolerance should be between +/-2mm.
Trowels, Shovels
Line, dory
Gum boots,
Aluminum straight edge
Leveling Instrument
4
METHOD STATEMENT -10 URINAL PARTITION WORK
Total Station
Sprit levels
Measuring tape
Mason finishing trowels
Hammer
Mason brushes and buckets
Cutting Machine
Hand Gloves
Incoming Materials Inspection Request (IMIR) will be raised to inspect once the
materials to site are delivered.
Work inspection request (WIR) will be raised prior to proceeding for Urinal partition
works.
Work inspection request (WIR) will be raised after completion of Urinal partition
works.
All work and individual safety precautions will be taken by SIPL as per SIPL & Project Site
Safety Policy and procedure