PTZ CENTAURUS
Project Name
Site
Drawing No. :
Location
1.1 Are all Work forces equipped with PPE before Commencement of work.
Vertical Area
Is Surface Preparation work checked Surrounding the Tie rods cutted Portion
2.3
2.4 Is Sufficient Double sided Tape used to patch up work in Tie rod Portion
2.5 Is any Coming out Membrane Rectified with Double Sided Tape
2.6 Is any Puncture in Membrane found need to be Rectified Properly by Double Sided Tape
2.7 Is any Joints in Sheet are getting open need to be rectified by Fixing Double sided tape
2.9 Backfilling need to be Done @ 300 mm in every lift to Avoid Damages to Membrane
Comments:
PTZ CENTAURUS
Project Name
Site
Drawing No. :
Location
SL No. DESCRIPTION YES NO SPCL CQRA REMARKS
1.1 Are all Work forces equipped with PPE before Commencement of work.
2 Substrate Prepration
2.1 Application
Horizontal Application
3.3 Is membrane overlapped (75mm) exactly to guideline and firmly rolled to prevent fish mouths.
4.1 Did you check the membrane after finishing bottom bar laying & rectified for any punture or damage.
Did you check the membrane after finishing renforcement cage for the raft & rectified for any ounctur
4.2 or damage.
5 Vertical Application
5.1 Is white HDPE flim facing prepared uniformly pointed brick work or temporary form work.
5.3 Was membrane installed in convenient heights, i.e. upto 50mm below the raft top.
5.4 Was release linear removed and side laps overlapped 75mm to guideline and firmly rolled.
5.5 Were the end laps & non-selvedge joints overlapped 75mm and sealed with fixer.
7.3 Is being taken to avoid use of sharp objects during concrete consolidation.
Comments:
AANCPL Engineer SPCL QA/QC Engineer PMC