Checklist for Shuttering

Project : Doc. No. : QA/CL-SHT/


Client : Project Location :

SITE LOCATION DATE

YES

SHUTTERING
1 Shuttering Material is New/ Old?

2 Repairs are OK?

3 Cleanliness of Shuttering?

4 Oiling of Shuttering?

FIXED SHUTTERING
5 Shuttering Design OK? (Dimension, Diagonal, Sunken portions etc.,)

6 Alignment/ Level/ Rigidity OK?

7 Check Props. Are they OK?

8 Check Acrow Span. Are they OK?

9 Check Braces. Are they OK?


10 Check sealing Joints/ Holes, OK?

11 Check for any rework or alterations

AFTER REMOVAL OF SHUTTER


11 Surface of Concrete - good moderate, level and line?

12 Repair of surface required?

(if YES then the same is to be carried out and checked by Quality Assurance Engineer)

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
QA/CL-SHT/

DATE

NO NA
Comments