You are on page 1of 4

Checklist for Anti Termite Treatment

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

SITE LOCATION DATE

YES

1 Check Surface Preparation

2 Check Chemicals

3 Check Application as per Manufacturer's Instructions (MSDS) & Architects Specs

4 Check Finished treatment of work

5 Check for Mix Proportion (As per Manufacturer's Instruction)Water/Kerosene

6 Check for Stages like Foundation/flooring / Joinery / External

Remarks of Quality Assurance Engineer:


Signature Date Remarks/ Comments
Checked By:
Approved By:
QA/CL-EXC/

DATE

NO NA
s/ Comments

You might also like