PREPARATION OF SUBGRADE 1 PREPARATION OF SUBGRADE to specified lines and Camber. Check for Cleaning and Making up of Soft spots & other irregularities. SAND - GRAVEL MIX FOR ROAD WORK. 1 Check the formation of subgrade with specified camber.
2 Check for spreading in layers as specified and watering has
been done on prior to the required proctor density to the required compaction. 3 Check for finished surfaces, compacted thickness, camber, gradient lines and slope. Are they acceptable? W.B.M: 1 Check for proper grading of aggregates.
road crossing LAYOUTS, GRADES & CROSS - SECTIONS OF COMPACTED SUBGRADE prior to spreading of aggregates.
3 Check for UNIFORM SPREAD THICKNESS of Aggregates.
4 Check for DRY ROLLING, using proper road roller.
5 Check for WET ROLLING of Aggregates and COMPACTION.
6 Check for FINISHED SURFACES, COMPACTED THICKNESS,
CAMBER, LINES AND SLOPE.Are they acceptable? ASPHALT/ BT FOR ROAD WORKS 2 Check Whether tack coat application is done properly. 3 Check for Uniform spread thickness of premix. Is it o.k.? 4 Check for finished surfaces,compacted thickness. gradient lines and slope: Are they acceptable. Drain work: 1 Marking layout line level of R.C.C drain. 2 Making R.C.C. drain all as per drawing in line, level & slope. CORRECTIVE ACTION PROPOSED- Item wise. If 'No' is marked, please specify reasons and thereafter corrective action proposed. (Add additional sheets, if necessary) Comments: Sl.No. Description YES NO NA