This document is a quality checklist for electrical installation works on a site. It lists 7 items to check, including following codes of practice for electrical wiring, electric bells and call systems, transformers, switchgear, overhead power lines, and power cables. For any items marked "No," it requests specifying reasons and proposed corrective actions. The checklist is to be filled out and signed by representatives of the contractor, client, and Lemcon company.
This document is a quality checklist for electrical installation works on a site. It lists 7 items to check, including following codes of practice for electrical wiring, electric bells and call systems, transformers, switchgear, overhead power lines, and power cables. For any items marked "No," it requests specifying reasons and proposed corrective actions. The checklist is to be filled out and signed by representatives of the contractor, client, and Lemcon company.
This document is a quality checklist for electrical installation works on a site. It lists 7 items to check, including following codes of practice for electrical wiring, electric bells and call systems, transformers, switchgear, overhead power lines, and power cables. For any items marked "No," it requests specifying reasons and proposed corrective actions. The checklist is to be filled out and signed by representatives of the contractor, client, and Lemcon company.
1 CODE OF PRACTICES 2 Code of Practice for Electrical wiring installation.
3 Code of Practice for the installation of electric bell and call
system. 4 Code of Practice for selection installation and maintenance of transformers Part 2 Installation. 5 Code of Practice for selection, installation and maintenance of switchgear and control gear Part 3- Installation.
6 Code of Practice for design installation and maintenance of
overhead power lines
7 Code of Practice for Installation and Maintenance of Power
Cables CORRECTIVE ACTION PROPOSED- Item wise. If 'No' is marked, please specify reasons and thereafter corrective action proposed. (Add additional sheets, if necessary) Comments:
Contractor's Rep.: Client Rep.: Lemcon Rep.:
C.R. Narayana Rao
Architects & Engineers Rev.1 dtd. 13.01.2006 1 of 1