You are on page 1of 4

Respon

sibilities SITE TEST REPORT Date :


Customer:
Legend Contractor’s name:
NG-SA
CSD ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
DIGITAL POWER DEMAND METER 4400006262
Page 1 of 4
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL DATA AND INFORMATION.

Panel No: Class

Make Scale

Serial No: VT Ratio

Model No: CT Ratio

ELECTRICAL TEST

1) CURRENT MEASUREMENT TEST. Limits: -0.2 to + 0.1%

Applied Meter Readings in Amps Errors %


secondary Expected
Current Amperes
(A) R Y B R Y B

0.25

0.5

0.75

1.0

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
DIGITAL POWER DEMAND METER 4400006262
Page 2 of 4
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

2) VOLTAGE MEASUREMENT TEST L-N. Limits: -0.2 to + 0.1%


Applied Meter Readings in KV Errors %
Secondary
Expected KV
Voltage in
Volts R Y B R Y B

3) VOLTAGE MEASUREMENT TEST L-L. Limits: -0.2 to + 0.1%

Applied Meter Readings in KV Errors %


secondary Expected KV
Voltage in Volts R Y B R Y B

4) FREQUENCY MEASUREMENT TEST. Limits: ± 0.5 %

INJECTED
METER READ OUT Error %
VOLTAGE in Volts FREQUENCY

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
DIGITAL POWER DEMAND METER 4400006262
Page 3 of 4
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

5) POWER MEASUREMENT TEST. Limits: ± 1%

Meter
Voltage in
Current in Amps Phase Angle Calculated MW reading in Error
Volts
MW

6) Reactive POWER MEASUREMENT TEST. Limits: -0.2 to + 0.1%

Voltage in Current in Meter reading in


Phase Angle Calculated MVAR Error
Volts Amps MVAR

7) Apparent POWER MEASUREMENT TEST. Limits: -0.2 to + 0.1%

Current in Calculated Meter reading


Voltage in Volts Error
Amps MVA in MVA

i) Power Factor Test:- Limits: ± 1%


TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
NG-SA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
DIGITAL POWER DEMAND METER 4400006262
Page 4 of 4
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Meter
Voltage Current Angle Cos Ф % Error
Reading

j) Maximum Demand :- (t =5 min) Limits: -0.2 to + 0.1%

Meter
Voltage in Calculated
Current in Amps Phase Angle reading in Error%
Volts MW
MW

k) Energy Measurement:- (t = 5 min ) Limits: -0.2 to + 0.1%

Calculated Meter reading Error%


Voltage Current Phase
In Volts In Amps Angle MWH MVARH MWH MVARH MWH MVARH

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________