SITE TEST REPORT Date :

Contractor’s name: Customer:


NG-SA

Name of substation: Al-Tawdihiyah 132/33KV Substation


NG-SA Contract No. :
4400008903

VOLTAGE TRANSFORMER Page 1 of 8


Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

POTENTIAL TRANSFORMER TEST

GENERAL DATA AND INFORMATIONS.

Circuit Ref: Rated voltage


Panel No: Sr.No:-R
Make Sr.No:-Y
Type Sr.No:-B

DESCRIPTION WINDING -1 WINDING -2


Primary Volts
Secondary Volts
Class
Burden
VT Ratio
Voltage factor (Vf)

DATE:
TESTING ENGINEER CSD- Engineer

Signature: Signature:
Name : Name :
NATIONAL GRID

Title: Index Number:


CL-NG-6460-002-024
Check List of Voltage Transformers Commissioning Page Number:
1 of 2

1.0 Equipment General Data and Information

Substation
Bay/Panel
Equipment Serial No

2.0 Mechanical Checks and Visual Inspections

Item Description Done Remarks


1. Inspect for physical damage or defects.
2. Check name plate and information with drawings and
specifications as specified in Data Schedule.
3. Check tightness of all bolted connection.
4. Check VT is grounded by bare copper conductor 1x240 mm 2 fault
current level 40kA and 2x240 mm 2 for fault current level above 40
kA.
5. Check mechanical clearances and proper operation of all isolation
and grounding devices.
6. Check integrity of primary fuses (if applicable).
7. Check insulation liquid level and leakage (if applicable).
8. Check that all secondary circuits are protected by MCBs or fuses.
Make sure that MCB for VT secondary is provided in the VT box.
9. Check secondary terminals size with a minimum 2.5 mm 2.
Check marking of primary and secondary terminals and polarity as
per standard.
10. Check all secondary circuit wiring ferruling at the end of each wire
and check it is identified indicating local device number and
terminal number.
11. Check the secondary burden is minimum 100VA.
12. Check that outdoor secondary wiring terminations are installed in
moisture proof enclosures.
13. Check tightness of all bolted connections (torque wrench method).
14. Check proper lugs have been used on terminations according to
SEC specification.
15. Check VT HV neutral is solidly grounded.

Archiving System Website: http://AMAS


NATIONAL GRID

Title: Index Number:


CL-NG-6460-002-024
Check List of Voltage Transformers Commissioning Page Number:
2 of 2

3.0 Electrical Tests

Item Description Done Remarks


1. Insulation test as following:
Primary to ground 5kV DC for one minute.
Primary to secondary 2.5kV DC for one minute.
Secondary to ground and core to core 1kV DC for one
minute.
2. Winding Resistance Test. (Ambient temperature shall be
recorded; winding resistance shall be referred to 75°C).
3. Turns Ratio Test.
4. Polarity Test.
5. Primary and secondary fuses rating checks for (if applicable).
6. High voltage test.

During normal HV tests on switchgear or GIS the VTs are


included in the HV test. VT secondary circuits should be
isolated from relays and meters by switch off all MCBs.
7. Check electrical operation of all isolating and grounding
devices (if applicable).
8. Check phase sequence, for the final three-phase assembly.
9. Verify secondary circuits, terminal to terminal for correctness
and tightness.
10. Loop resistance test and burden test.
11. Check gaps of protective flashover devices (if applicable).
12. Measure dissipation factor (tan ), this test should be applied
only to transformers with liquid immersed primary winding
insulation for 110 kV and above

CSD Contractor T&C Contractor


Name
Sign.

Archiving System Website: http://AMAS


SITE TEST REPORT Date :
Contractor’s name: Customer:
NG-SA

Name of substation: Al-Tawdihiyah 132/33KV Substation


NG-SA Contract No. :
4400008903

VOLTAGE TRANSFORMER Page 4 of 8


Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

1. INSULATION RESISTANCE TEST:

Instrument :

Make :
Model No. / Sl. No. :

Applied Voltage : Primary to Ground 5 KV DC for one minute.


Primary to Secondary 2.5 KV DC for one minute.
Secondary to Ground and Core to core 1 KV DC for one minute.
Criteria : More than 1000 M Ohms for Primary – Secondary / Earth.
More than 10 M Ohms for Secondary – Earth and Between Secondary’s

Applied Between IR Value in Mega Ohms


Phase A Phase B Phase C Remarks
Primary - Earth

Primary-Secondary-1
Primary – Secondary 2
Secondary1 – Earth
Secondary 2 – Earth
Secondary 1 – Secondary 2

2. Winding Resistance (Secondary side)

Instrument :

Make :
Model No. / Sl. No. :

Criteria : Within ± 5% of Factory Test Report


o
Amb.Temp : C
Measured Value in Ohms Factory
Core at Value Ohms
% Variation
Phase at Remarks
o
C 75o C 75o C
Full Wdg
1 Mid Tap
A Full Wdg
2 Mid Tap

DATE:
TESTING ENGINEER CSD- Engineer

Signature: Signature:
Name : Name :
SITE TEST REPORT Date :
Contractor’s name: Customer:
NG-SA

Name of substation: Al-Tawdihiyah 132/33KV Substation


NG-SA Contract No. :
4400008903

VOLTAGE TRANSFORMER Page 5 of 8


Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Full Wdg
1 Mid Tap
B Full Wdg
2 Mid Tap
Full Wdg
1 Mid Tap
C Full Wdg
2 Mid Tap

Formula to convert winding resistance to reference temperature at 75  C for copper winding.

NOTE: 1.
Rc = Calculated value at 75  C
Rm = Measurement value which contained a measurement cable.

NOTE: 2
Calculated 75  C Rc = (Rm-Rx) x (234.5+75)
(234.5+Ta)

Rx = Resistance value of the measurement


cable. Ta = Ambient Temperature  C

NOTE: 3

Resistance value of measurement cable Rx = Ω


3. Ratio Test

INSTRUMENTS: Make: Model: Sr.No:

Voltage Applied to Primary: Volt (Full Tap) & Volt (Mid Tap)

Measured
Theoretical Ratio
Phase Tap Secondary Measured Ratio % Error
Voltage
Core-1 Core-2 Core-1 Core-2 Core-1 Core-2 Core-1 Core-2

Full Tap
A
Mid Tap

DATE:
TESTING ENGINEER CSD- Engineer

Signature: Signature:
Name : Name :
SITE TEST REPORT Date :
Contractor’s name: Customer:
NG-SA

Name of substation: Al-Tawdihiyah 132/33KV Substation


NG-SA Contract No. :
4400008903

VOLTAGE TRANSFORMER Page 6 of 8


Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Full Tap
B
Mid Tap

Full Tap
C
Mid Tap

4. POLARITY TEST :

Instrument :
 Tick here if found okay

Polarity checked
Phase Core
& found okay
A 1
2
B 1
2
C 1
2

5. FUSE CHECK:

6. PHASE TEST:

DATE:
TESTING ENGINEER CSD- Engineer

Signature: Signature:
Name : Name :
SITE TEST REPORT Date :
Contractor’s name: Customer:
NG-SA

Name of substation: Al-Tawdihiyah 132/33KV Substation


NG-SA Contract No. :
4400008903

VOLTAGE TRANSFORMER Page 7 of 8


Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

7. Burden Test :

INSTRUMENT :

Multimeter :

Make :

Model / Sl. No. :

Test Results:

Voltage Current Burden


Phase Core VT Sec. Rated Design
Applied Measured VxI Remarks
Ref. Ref. Terminal no. Burden (VA)
(V) (mA) (VA)
1
A
2

1
B
2

1
C
2

DATE:
TESTING ENGINEER CSD- Engineer

Signature: Signature:
Name : Name :
SITE TEST REPORT Date :
Contractor’s name: Customer:
NG-SA

Name of substation: Al-Tawdihiyah 132/33KV Substation


NG-SA Contract No. :
4400008903

VOLTAGE TRANSFORMER Page 8 of 8


Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

8. BACK ENERZISATION VOLTAGE AT RATED VOLTAGE: (15 MINUTES)

Note: This test has not been included in TCS-P-105 Rev01


INSTRUMENTS:

Make :

Model / Sl. No. :

Procedure

a) Remove the connections in primary side of voltage transformers in all the three
phases to ensure that the primary induced voltage is not fed to the switchgear bus or the other equipments.

b) Apply the voltage to secondary terminals of one of the core of the PT.
Gradually increase the voltage up to 1 volt and check the corresponding
Voltage developed in the same secondary terminal of the core.

Applied Voltage in volts Measured Voltage in volts


Core-1 A Ph B Ph C Ph Core-2 A Ph B Ph C Ph
1a1-1n 2a1-2n

1a2-1n 2a2-2n

DATE:
TESTING ENGINEER CSD- Engineer

Signature: Signature:
Name : Name :