Professional Documents
Culture Documents
2. VISUAL CHECKS:
Results OK OK OK OK
SIGNATURE
DATE 02.06.2020
SITE ACCEPTANCE TEST REPORT FOR 11kV CABLE
QASR AL JURF DEVELOPMENT
PROJECT EQUIPMENT 11kV CABLE
INFRASTRUCTURE-ENABLING WORKS
CLIENT ADDC/IMKAN DATE 02.06.2020
CONTRACTOR ENVICON EMIRATES LOCATION JRP31-JOINT 2
TESTING COMPANY XOLINE PAGE Page 2 of 3
6. VLF TEST:
SIGNATURE
DATE 02.06.2020
SITE ACCEPTANCE TEST REPORT FOR 11kV CABLE
QASR AL JURF DEVELOPMENT
PROJECT EQUIPMENT 11kV CABLE
INFRASTRUCTURE-ENABLING WORKS
CLIENT ADDC/IMKAN DATE 02.06.2020
CONTRACTOR ENVICON EMIRATES LOCATION JRP31-JOINT 2
TESTING COMPANY XOLINE PAGE Page 3 of 3
7. FORMULA USED:
Applied RMS Voltage = 3U0 / √2kV
Where U0 = 11/√3 = 6.35kV
Applied RMS Voltage =( 3x6.35)/ √2
= 13.5 kV RMS
8. EQUIPMENT DETAILS:
Calibration
Sl.No Instrument Name Make / Model Serial No
Valid
1 IR Tester Megger / MIT515 101574096 18.03.2021
SIGNATURE