Professional Documents
Culture Documents
Check all NGR auxiliary equipment for proper installations in accordance with
5
approved vendor drawings.
Check cables for proper connections (no damage, within allowed cable bending
6
radius, proper cable supports, cable gland tightness and accessories).
11 Confirm that conduits for cable supports are made of non-metallic materials.
Name
Date
Page :
' PROJECT NAME ' Inspect Date :
Space heater
Note : In case of conflicts with the manufacturer's requirements, the manufacturer's requirements shall govern.
Name
Date