2. VISUAL TESTS:
a. CT correctly connected as per drawing : OK
b. All terminals tightness secured : OK
c. Grounding and shorting connections are secured : OK
3. INSULATION TESTS:
Amb Temp : °C
VALUES IN GΩ
N-Phase
Ground CT – 2 CT – 1 Test voltage
PRIMARY Primary: 5000 V
CT – 1 Sec – Sec: 500 V
SIGNATURE
NAME
DATE
SITE ACCEPTANCE TEST REPORT
11kV, 1250A, 4 WAY PANEL
DESIGN AND BUILD OF 300 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY SUBSTATION No AH 0896
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL FEEDER No.
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY & GENERAL
SUB CONTRACTOR SCHEME NO
CONSTRUCTION LLC.
EQUIPMENT NEUTRAL - CURRENT TRANSFORMER LOCATION Al HAYER
SIGNATURE
NAME
DATE
SITE ACCEPTANCE TEST REPORT
11kV, 1250A, 4 WAY PANEL
DESIGN AND BUILD OF 300 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY SUBSTATION No AH 0896
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL FEEDER No.
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY & GENERAL
SUB CONTRACTOR SCHEME NO
CONSTRUCTION LLC.
EQUIPMENT NEUTRAL - CURRENT TRANSFORMER LOCATION Al HAYER
7. RATIO TEST:
N S1 – S2
SIGNATURE
NAME
DATE