This document provides details for testing the trip circuit supervision relay for an 11kV switchgear panel. The test includes checking the relay details, general inspection of installation and wiring, measuring coil resistances, performing pickup and dropout tests to check operating times, measuring reset time, and recording test equipment details. The test aims to verify proper operation of the protection relay and its corresponding circuit supervision.
This document provides details for testing the trip circuit supervision relay for an 11kV switchgear panel. The test includes checking the relay details, general inspection of installation and wiring, measuring coil resistances, performing pickup and dropout tests to check operating times, measuring reset time, and recording test equipment details. The test aims to verify proper operation of the protection relay and its corresponding circuit supervision.
This document provides details for testing the trip circuit supervision relay for an 11kV switchgear panel. The test includes checking the relay details, general inspection of installation and wiring, measuring coil resistances, performing pickup and dropout tests to check operating times, measuring reset time, and recording test equipment details. The test aims to verify proper operation of the protection relay and its corresponding circuit supervision.
END USER AADC FEEDER K02 CONSULTANT AL SUWEIDI MAIN AL JABER BUILDING CONTRACTOR SUB CONTRACTOR ALPHA POWER SCHEME NO SUBSTATION No LOCATION AL SAAD
TRIP CIRCUIT SUPERVISION RELAY TEST
1. RELAY DETAILS:
RELAY MAKE SERIAL NO
RELAY TYPE AUX. VOLTAGE
2. GENERAL INSPECTION AND CHECKS
(1) Installation and wiring correct to relevant drawings : (2) Model Number and rating information is correct : (3) Relay case connected to local earth bar : (4) Output contacts are operating properly : (5) Flag indication and operation checked :
3. RESISTANCE OF EACH COIL:
ELEMENT K1 K2 K3 RESISTANCE
4. PICK UP & DROP OFF TEST:
PICK UP(V) DROP OFF (V) OPERATING TIME (ms) CONTACT/INDICATION
5. RESET TIME WHEN SUPPLY IS SWITCHED FROM VN TO OFF.
APPLIED VOLTAGE ATTACH TIME ( K2 + K3 )
48 Vdc
6. TEST EQUIPMENT DETAILS:-
SERIAL DESCRIPTION MAKE MODEL CALIBRATION DUE DATE NO. Digital Multimeter Fluke Secondary Injection Programma