FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 80112C

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Construction and Operation Check.
2 Main Contact Resistance Measurement.
3 Insulation Resistance Measurement.
4 Timing & Motion test.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

Technical data
Manufacture Rated line-charging breaking current A
Type designation Rated cable charging breaking current A
Serial number Rated SF6 gas pressure for interuption Pe Mpa
Rated voltage kV Rated supply voltage of closing and opening device V DC
Rated lightning imp. withstand voltage kV Rated supply voltage of auxiliary circuits V DC
Rated switching imp. withstand voltage kV Rated supply voltage of motor V DC
Rated frequency Hz Contains fluorinate greenhouse gases covered by
Rated normal current A the Kyoto Protocol
Rated duration of short-current s Mass of SF6 gas kg
Rated short-circuit breaking current kA Mass kg
Rated short-circuit making current kA Rated operating sequence
First-pole-to-clear factor Standart to which manufacture
Rated out-of-phase breaking current kA Year of manufacture
Temerature class
EGAT Serrial Number Contact No.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 2 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

1. Construction and Operation Check.


General check
- Machanical inspection check Satisfy Un-Satisfy
- Equipment checked againt specification sheet Satisfy Un-Satisfy
- All component check for signs of damage Satisfy Un-Satisfy
- All accessories fastening check Satisfy Un-Satisfy
- Check against wiring schematic and diagrams Satisfy Un-Satisfy
- No gas leakage check Satisfy Un-Satisfy
- Densimeter check Satisfy Un-Satisfy
- Insulation resistance of wiring / control 500 Vdc
- Closing circuit (CB open) MΩ
- Tripping circuit 1 (CB close) MΩ
- Tripping circuit 2 (CB close) MΩ
- Motor circuit MΩ
- Heater and lighting circuit MΩ
Operation check
Manual operation check
- Manual Close Satisfy Un-Satisfy
- Manual Open Satisfy Un-Satisfy
- Emergency Trip Satisfy Un-Satisfy
- Manual operated motor drive round

Electrical operation check


- Motor spring charging operation check Satisfy Un-Satisfy
- Spring charged indicator check Satisfy Un-Satisfy
- Spring charging time seconds
- Motor current consuption ampere

- Electrical Close Satisfy Un-Satisfy


- Electrical Open Satisfy Un-Satisfy
- Emergency Trip
- Counter operation check Satisfy Un-Satisfy
- Antipumping operation function check Satisfy Un-Satisfy

- Space heater&cubicle lighting operated current ampere


- heater current A
- lighting current A

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 3 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

2. Main Contact Resistance Measurement.


Instrument : Date of test :
Manufacture : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Main Contact Resistance Reading ( mΩ )


Test Current Criteria
Pole A Pole B Pole C

100 Adc.

3. Insulation Resistance Measurement.


Instrument : Date of test : :
Manufacture : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Insulation Resistance at 1 minute (MΩ)


Energize Ground (Vdc) Pole A Pole B Pole C
Part 1 Part 2 5,000
Part 1 Ground 5,000
Part 2 Ground 5,000

4. Timing & Motion test.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Time at Rated Voltage (msec)


Channel Contact Criteria
Close Trip1 Trip2 CO1 CO2
Pole A Tolerance
Pole B Closing time <….. ms
Pole C Opening time min …. ms - max …. ms

AUX. NO Ph.A Close-Open time <…. ms


AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 4 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

Main test sequence Open-0.3s-Close-Open Trip 1


Time at Rated Voltage (msec)
Channel Contact Criteria
Open Interval Time Close-Open
Pole A Tolerance
Pole B Closing time <….. ms
Pole C Opening time min …. ms - max …. ms

AUX. NO Ph.A Close-Open time <…. ms


AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Main test sequence Open-0.3s-Close-Open Trip 2


Time at Rated Voltage (msec)
Channel Contact Criteria
Open Interval Time Close-Open
Pole A Tolerance
Pole B Closing time <….. ms
Pole C Opening time min …. ms - max …. ms

AUX. NO Ph.A Close-Open time <…. ms


AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Time at Minimum Voltage (msec)


Channel Contact
Close Trip1 Trip2
Pole A
Pole B
Pole C
AUX. NO Ph.A
AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 5 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

Time at Maximum Voltage (msec)


Channel Contact
Close Trip1 Trip2
Pole A
Pole B
Pole C
AUX. NO Ph.A
AUX. NC Ph.A
AUX. NO Ph.B
AUX. NC Ph.B
AUX. NO Ph.C
AUX. NC Ph.C

Note : - Operated voltage of Closing coil is 85% t0 110% 0f rated supply voltage
Vrated = 125 Vdc Vmin = 106.25 Vdc Vmax = 137.5 Vdc
- Operated voltage of Tripping coil is 70% t0 110% 0f rated supply voltage
Vrated = 125 Vdc Vmin = 87.5 Vdc Vmax = 137.5 Vdc

Travel Parameter
CONDITION PHASE Travel Speed Contact Stroke Over Travel Rebounce Damping Time
(m/s) (mm) (mm) (ms) (ms)
Close A
B
C
Open A
B
C
O-C-O A
B
C
C-O A
B
C

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 6 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 7 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 8 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 9 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 10 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 11 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 12 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 13 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 14 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 15 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 16 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 17 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 18 of 19
FIELD INSPECTION AND TEST REPORT

230kV SF6 CIRCUIT BREAKER INDIVIDUAL TEST REPORT

4. Timing & Motion test. TYPE OF TIME TESTING

CLOSING 125Vdc.

OPENING ( Coil no.1 ) 125Vdc.

OPENING ( Coil no.2 ) 125Vdc.

O-C-O ( Coil no.1 ) 125Vdc.

O-C-O ( Coil no.2 ) 125Vdc.

C-O ( Coil no 1 ) 125Vdc.

C-O ( Coil no 2 ) 125Vdc.

CLOSING 137.5 Vdc.

OPENING ( Coil no.1 ) 137.5 Vdc.

OPENING ( Coil no.2 ) 137.5 Vdc.

CLOSING 106.25 Vdc.

OPENING ( Coil no.1 ) 87.5 Vdc.

OPENING ( Coil no.2 ) 87.5 Vdc.

Instrument :
Manufacturer :
Model :
Serial no :
Cal.date :

Date of test :

Tested by CECO :

Confirmed by :

Witnessed by EGAT :

Page 19 of 19