OWNER : PROVINCIAL ELECTRICCITY AUTHORITY TITIE : POWER CABLE LIST

PROJECT NAME : 115/24kV GIS PATHUMWAN SUBSTATION DOC. NO. :


CONTRACTOR : LOXLEY PUBLIC COMPANY LIMITED PROJECT MANAGER : Mr. Prarinya Supprarinyaporn
SUBCONTRACTOR : COLLECTIVE ENGINEERING CO.,LTD REV. : 00
POWER CABLE LIST
Length Pulling Cable Insulation
No. From To Cable Size Phase Remark
Start Code Finish Code Total (m) Start Finish Resistance (Ω)
A
1 115kV GIS Room Line1 ( Top ) - 800 Sq.mm. B
C
A
2 115kV GIS Room Line1 ( Bottom ) - 800 Sq.mm. B
C
A
3 115kV GIS Room Line1 ( Top ) - 800 Sq.mm. B
C
A
4 115kV GIS Room Line1 ( Bottom ) - 800 Sq.mm. B
C
A
5 115kV GIS Room Line1 ( Top ) - 800 Sq.mm. B
C
A
6 115kV GIS Room Line1 ( Bottom ) - 800 Sq.mm. B
C
A
7 115kV GIS Room Line1 ( Top ) - 800 Sq.mm. B
C
A
8 115kV GIS Room Line1 ( Bottom ) - 800 Sq.mm. B
C
A
9 115kV GIS Room TR1 Power Transformer No.1 800 Sq.mm. B
C
A
10 115kV GIS Room TR2 Power Transformer No.2 800 Sq.mm. B
C
A
11 115kV GIS Room TR3 Power Transformer No.3 800 Sq.mm. B
C
A 0342 0312 30 10/11/2017 10/11/2017 908 GΩ. Drum No.5 800 Sq.mm. 342m.
B 0282 0252 30 10/11/2017 10/11/2017 718 GΩ. - Insulation Resistance = 1.2TΩ.
C 0222 0192 30 10/11/2017 10/11/2017 890 GΩ. - Start Code 0342 Finish Code 0162 Total 180m.
13 24kV GIS Room Bay1 Power Transformer No.1 800 Sq.mm.
A' 0312 0282 30 10/11/2017 10/11/2017 1.05 TΩ.
B' 0252 0222 30 10/11/2017 10/11/2017 782 GΩ.
C' 0192 0162 30 10/11/2017 10/11/2017 1.14 TΩ.
A 0162 0135 27 11/12/2017 11/12/2017 891 GΩ. Drum No.5 800 Sq.mm. 342m.
B 0108 0081 27 11/12/2017 11/12/2017 1.10 TΩ. - Insulation Resistance = 1.2TΩ.
C 0054 0027 27 11/12/2017 11/12/2017 798 GΩ. - Start Code 0162 Finish Code 0000 Total 162m.
14 24kV GIS Room Bay2 Power Transformer No.2 800 Sq.mm.
A' 0135 0108 27 11/12/2017 11/12/2017 811 GΩ.
B' 0081 0054 27 11/12/2017 11/12/2017 988 GΩ.
C' 0027 0000 27 11/12/2017 11/12/2017 861 GΩ.

A 0254 0220 34 08/11/2017 08/11/2017 1.02 TΩ. Drum No.6 800 Sq.mm. 288m.
B 0186 0152 34 08/11/2017 08/11/2017 1.14 TΩ. - Insulation Resistance = 918GΩ.
C 0118 0084 34 08/11/2017 08/11/2017 971 GΩ. - Start Code 0288 Finish Code 0084 Total 204m.
15 24kV GIS Room Bay3 Power Transformer No.3 800 Sq.mm.
OWNER : PROVINCIAL ELECTRICCITY AUTHORITY TITIE : POWER CABLE LIST
PROJECT NAME : 115/24kV GIS PATHUMWAN SUBSTATION DOC. NO. :
CONTRACTOR : LOXLEY PUBLIC COMPANY LIMITED PROJECT MANAGER : Mr. Prarinya Supprarinyaporn
SUBCONTRACTOR : COLLECTIVE ENGINEERING CO.,LTD REV. : 00
POWER CABLE LIST
Length Pulling Cable Insulation
No. From To Cable Size Phase Remark
Start Code Finish Code Total (m) Start Finish Resistance (Ω)
15 24kV GIS Room Bay3 Power Transformer No.3 800 Sq.mm.
A' 0288 0254 34 08/11/2017 08/11/2017 998 GΩ.
B' 0220 0186 34 08/11/2017 08/11/2017 1.08 TΩ.
C' 0152 0118 34 08/11/2017 08/11/2017 1.01 TΩ.
A 0084 0070 14 10/11/2017 10/11/2017 870 GΩ. Drum No.6 800 Sq.mm. 288m.
B 0056 0042 14 10/11/2017 10/11/2017 984 GΩ. - Insulation Resistance = 918GΩ.
C 0028 0014 14 10/11/2017 10/11/2017 1.12 TΩ. - Start Code 0084 Finish Code 0000 Total 84m.
16 24kV GIS Room Bay2 24kV GIS Room Bay3 800 Sq.mm.
A' 0070 0056 14 10/11/2017 10/11/2017 860 GΩ.
B' 0042 0028 14 10/11/2017 10/11/2017 751 GΩ.
C' 0014 0000 14 10/11/2017 10/11/2017 901 GΩ.
A 0381 0333 48 07/11/2017 07/11/2017 1.02 TΩ. Drum No.8 240 Sq.mm. 438m.
17 24kV GIS Room Bay1 Cap Bank Room C1A 240 Sq.mm. B 0210 0162 48 07/11/2017 07/11/2017 1.11 TΩ. - Insulation Resistance = 1.05TΩ.
C 0162 0114 48 07/11/2017 07/11/2017 921 GΩ. - Start Code 0381 Finish Code 0114 Total 144m.
A 0267 0216 51 06/11/2017 06/11/2017 809 GΩ. Drum No.7 240 Sq.mm. 429m.
18 24kV GIS Room Bay1 Cap Bank Room C1B 240 Sq.mm. B 0216 0165 51 06/11/2017 06/11/2017 957 GΩ. - Insulation Resistance = 953GΩ.
C 0165 0114 51 06/11/2017 06/11/2017 793 GΩ. - Start Code 0267 Finish Code 0114 Total 153m.
A 0438 0381 57 07/11/2017 07/11/2017 1.13 TΩ. Drum No.8 240 Sq.mm. 438m.
19 24kV GIS Room Bay2 Cap Bank Room C2A 240 Sq.mm. B 0114 0057 57 07/11/2017 07/11/2017 969 GΩ. - Insulation Resistance = 1.05TΩ
C 0057 0000 57 07/11/2017 07/11/2017 984 GΩ. - Start Code 0438 Finish Code 0000 Total 171m.
A 0429 0375 54 06/11/2017 06/11/2017 761 GΩ. Drum No.7 240 Sq.mm. 429m.
20 24kV GIS Room Bay2 Cap Bank Room C2B 240 Sq.mm. B 0375 0321 54 06/11/2017 06/11/2017 838 GΩ. - Insulation Resistance = 953GΩ
C 0321 0267 54 06/11/2017 06/11/2017 987 GΩ. - Start Code 0429 Finish Code 0267 Total 162m.
A 0114 0076 38 06/11/2017 06/11/2017 966 GΩ. Drum No.7 240 Sq.mm. 429m.
21 24kV GIS Room Bay3 Cap Bank Room C3A 240 Sq.mm. B 0076 0038 38 06/11/2017 06/11/2017 1.07 TΩ. - Insulation Resistance = 953GΩ
C 0038 0000 38 06/11/2017 06/11/2017 887 GΩ. - Start Code 0114 Finish Code 0000 Total 114m.
A 0333 0292 41 07/11/2017 07/11/2017 1.19 TΩ. Drum No.8 240 Sq.mm. 438m.
22 24kV GIS Room Bay3 Cap Bank Room C3B 240 Sq.mm. B 0292 0251 41 07/11/2017 07/11/2017 1.07 TΩ. - Insulation Resistance = 1.05TΩ
C 0251 0210 41 07/11/2017 07/11/2017 981 GΩ. - Start Code 0333 Finish Code 0210 Total 123m.
A 0146 0073 73 08/11/2017 08/11/2017 787 GΩ. Drum No.9 70 Sq.mm. 438m.
23 24kV GIS Room Bay1 Station Service No.1 70 Sq.mm. B 0219 0146 73 08/11/2017 08/11/2017 814 GΩ. - Insulation Resistance = 983GΩ
C 0073 0000 73 08/11/2017 08/11/2017 1.08 TΩ. - Start Code 0219 Finish Code 0000 Total 219m.
A 0438 0365 73 08/11/2017 08/11/2017 795 GΩ. Drum No.9 70 Sq.mm. 438m.
24 24kV GIS Room Bay3 Station Service No.2 70 Sq.mm. B 0365 0292 73 08/11/2017 08/11/2017 882 GΩ. - Insulation Resistance = 983GΩ
C 0292 0219 73 08/11/2017 08/11/2017 901 GΩ. - Start Code 0438 Finish Code 0219 Total 219m.