Project: Power supply to Plot P18 at Zayed

Military City
Project no.: D108337 Substation: SWH38A1
Location: Plot P18, Zayed Military City

Client ADDC Site Ref. 33/11kV PU - 1 / 11kV Switchgear


Contractor Time Electro Feeder No. K01 to K09
Testing Company Alphapower Date of Test 04.05.2020
SITE ACCEPTANCE TEST REPORT FOR BUSBAR CONTACT RESISTANCE MEASUREMENT

1. BUSBAR CONTACT RESISTANCE MEASUREMENT

Injected Current: 100 A dc Ambient Temperature: 29˚C


Measured Contact Resistance (µΩ)
Sr.No. FEEDER REFERENCE Remarks
L1 L2 L3
1 K01 – K02 326 319 316 OK
2 K02 – K03 421 428 418 OK
3 K03 – K04 426 423 416 OK
4 K04 – K05 532 536 527 OK
5 K05 – K06 548 542 525 OK
6 K06 – K07 413 408 399 OK
7 K07 – K08 416 414 415 OK
8 K08 – K09 404 406 399 OK
9 K01 – K09 470 477 446 OK

2. REMARKS:

3. TEST EQUIPMENT DETAILS:

Description Make Model Serial No Calibration Due Date


Micro Ohm meter Megger MOM200A 1202852 28.05.2020

TESTED BY CONTRACTOR WITNESSED /APPROVED BY


COMPANY ALPHAPOWER TIME ELECTRO ADDC
NAME JAYAPRAKASH M P

SIGNATURE

DATE 04.05.2020

SAT Report for BB CRM Page 1 of 1