You are on page 1of 4

132KV/11.

5KV Grid Station


Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 1 of 4
Auxiliary Transformer
Date: 14-07-2017

Equipment Make: Liaoning

11.5 KV/0.415KV Auxiliary Transformer

Transformer nameplate data


Serial number 54LYDT11213 Apparatus ID
Manufacturer No. phases 3
Manufacturing year Vector group Dyn11
Manufacturer type Two Winding Feeder

Voltage ratings
Winding Voltage L-L Voltage L-N Insul. level L-L
Prim 11.5 kV kV kV
Sec 0.415 kV 239.60 kV kV

Turns Ratio Prim-Sec


Test voltage 150 V
Type of tap changer OLTC

IEC 61378-1 No

Standard test

Phase A Phase B Phase C


Tap Nom. ratio TTR Ratio dev TTR Ratio dev TTR Ratio dev
1 49.1965 49.2289 0.07 % 49.1912 -0.01 % 49.2288 0.07 %
2 47.9966 48.0063 0.02 % 48.0047 0.02 % 48.0034 0.01 %
3 46.7967 46.7921 -0.01 % 46.7912 -0.01 % 46.7918 -0.01 %
4 45.5968 45.6043 0.02 % 45.6016 0.01 % 45.6009 0.01 %
5 44.3968 44.4123 0.03 % 44.4406 0.10 % 44.4114 0.03 %

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 2 of 4
Auxiliary Transformer
Date: 14-07-2017

Equipment Make: Liaoning

Graphs for standard test

DC Winding Resistance Prim


Test current 3.0 A Use CP SB1 No
Winding temperature °C Mode Manual

Type of tap changer OLTC

Standard test

Phase A Phase B Phase C


Tap R meas R dev R corr R meas R dev R corr R meas R dev R corr
5 7.987 Ω 0.090 % 7.987 Ω 7.551 Ω 0.093 % 7.551 Ω 7.539 Ω 0.100 % 7.539 Ω
4 8.004 Ω 0.094 % 8.004 Ω 8.030 Ω 0.084 % 8.030 Ω 8.020 Ω 0.085 % 8.020 Ω
3 8.553 Ω 0.073 % 8.553 Ω 8.035 Ω 0.092 % 8.035 Ω 8.032 Ω 0.092 % 8.032 Ω
2 8.584 Ω 0.050 % 8.584 Ω 8.043 Ω 0.038 % 8.043 Ω 8.587 Ω 0.089 % 8.587 Ω
1 9.200 Ω 0.075 % 9.200 Ω 8.598 Ω 0.093 % 8.598 Ω 8.605 Ω 0.091 % 8.605 Ω

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 3 of 4
Auxiliary Transformer
Date: 14-07-2017

Equipment Make: Liaoning

DC Winding Resistance Sec


Test current 10.0 A Use CP SB1 No
Winding temperature °C Mode Manual

Type of tap changer None

Standard test

Phase A Phase B Phase C


Tap R meas R dev R corr R meas R dev R corr R meas R dev R corr Assessment
n/a 4.355 mΩ 0.090 % 4.355 mΩ 6.440 mΩ 0.089 % 6.440 mΩ 9.136 mΩ 0.054 % 9.136 mΩ Not ass.

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 4 of 4
Auxiliary Transformer
Date: 14-07-2017

Equipment Make: Liaoning

Insulation Resistance Test

Sr. No. Connection Applied Voltage Resistance

1 HV+LV+G 5KV 1.353T

2 HV+G 5KV >15T

3 LV+G 1KV >2T

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date: