You are on page 1of 7

132KV/11.

5KV Grid Station


Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 1 of 7
11 KV CT Circuit
Date: 14-07-2017

Equipment Make: FICO

11 KV CT Circuit Verification

Sr. Panel Connection Applied Protection Core Metering Core


# # Current
Differential O/C P1 P2 P3

1 R-N 40 0.13 0.131 0.134 0 0

2 16-01- Y-N 40 0.126 0.129 0 0.128 0


39
3 B-N 40 0.124 0.121 0 0 0.124

Sr. Panel Connection Applied Protection Core Metering Core


# # Current
Differential O/C P1 P2 P3

1 R-N 40 Differential 0.129 0.134 0 0


Circuit
2 16-01- Y-N 40 0.124 0 0.128 0
Cable Not
49 Installed
3 B-N 40 0.132 0 0 0.124

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 2 of 7
11 KV CT Circuit
Date: 14-07-2017

Equipment Make: FICO

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.47 0 0.47

2 16-04- Y-N 40 0.51 0 0.49 0.49


8-18
3 B-N 40 0.48 0 0 0.49

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.49 0 0.49

2 16-11- Y-N 40 0.51 0 0.50 0.50


23-54
3 B-N 40 0.48 0 0 0.51

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.48 0 0.48

2 16-12- Y-N 40 0.51 0 0.49 0.49


24-54
3 B-N 40 0.48 0 0 0.51

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 3 of 7
11 KV CT Circuit
Date: 14-07-2017

Equipment Make: FICO


Sr Panel Connection Applied Protection Core Metering Core
.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.47 0 0.47

2 16-05- Y-N 40 0.51 0 0.49 0.49


17-54
3 B-N 40 0.48 0 0 0.51

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.48 0 0.48

2 16-04- Y-N 40 0.51 0 0.50 0.50


16-54
3 B-N 40 0.48 0 0 0.51

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.49 0 0.49

2 16-08- Y-N 40 0.51 0 0.50 0.50


20-54
3 B-N 40 0.48 0 0 0.50

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 4 of 7
11 KV CT Circuit
Date: 14-07-2017

Equipment Make: FICO


Sr Panel Connection Applied Protection Core Metering Core
.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.49 0 0.49

2 16-09- Y-N 40 0.51 0 0.49 0.49


21-54
3 B-N 40 0.48 0 0 0.50

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.49 0 0.49

2 16-07- Y-N 40 0.51 0 0.48 0.48


19-54
3 B-N 40 0.48 0 0 0.51

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 16-06- R-N 40 0.49 0.50 0 0.50


18-54
2 Y-N 40 0.51 0 0.51 0.51

3 B-N 40 0.48 0 0 0.49

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 5 of 7
11 KV CT Circuit
Date: 14-07-2017

Equipment Make: FICO


Sr Panel Connection Applied Protection Core Metering Core
.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.49 0 0.49

2 16-10- Y-N 40 0.51 0 0.49 0.49


22-54
3 B-N 40 0.48 0 0 0.51

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.49 0 0.49

2 16-3- Y-N 40 0.51 0 0.49 0.49


15-54
3 B-N 40 0.48 0 0 0.51

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.49 0 0.49

2 16-1- Y-N 40 0.51 0 0.49 0.49


13-54
3 B-N 40 0.48 0 0 0.49

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 6 of 7
11 KV CT Circuit
Date: 14-07-2017

Equipment Make: FICO


Sr Panel Connection Applied Protection Core Metering Core
.# # Current
O/C P7 P1 P5

1 16-2- R-N 40 0.49 0.48 0 0.48


14-54
2 Y-N 40 0.51 0 0.49 0.49

3 B-N 40 0.48 0 0 0.49

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P7 P1 P5

1 R-N 40 0.49 0.48 0 0.48

2 16-1 Y-N 40 0.51 0 0.49 0.49


-5-18
3 B-N 40 0.48 0 0 0.49

Sr Panel Connection Applied Protection Core Metering Core


.# # Current
O/C P5 P2 P3

1 R-N 40 0.49 0.48 0 0.48

2 16-02- Y-N 40 0.51 0 0.49 0.49


6-18
3 B-N 40 0.48 0 0 0.49

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date:
132KV/11.5KV Grid Station
Customer: GEPCO
Head Marala

Contractor: SinoSteel China


Page 7 of 7
11 KV CT Circuit
Date: 14-07-2017

Equipment Make: FICO


Sr Panel Connection Applied Protection Core Metering Core
.# # Current
O/C P5 P2 P3

1 R-N 40 0.49 0.48 0 0.48

2 16-03- Y-N 40 0.51 0 0.49 0.49


7-18
3 B-N 40 0.48 0 0 0.49

Tested By Witnessed by Client

Ayk Pvt. Ltd. GEPCO


Name:
Signature:
Date: