Professional Documents
Culture Documents
STATION A : 130153_SAMBIREJO
GAMPENGREJO KEDIRI
STATION B : 130151_YONIF 521 KEDIRI
PROJECT : NEW ALU
WPO No. : 2015 NEFPA/PO/08082018/0574-a
ATP DATE :
9500 MPR
SITE ACCEPTANCE TEST RESULT SHEET
Acceptance Date
Name : Name :
Date : Date :
Signature : Signature :
Name : Name :
Date : Date :
Signature : Signature :
Acceptance Category*
If conditionally accepted or not accepted, the action required to achieve acceptance must be
detailed write down.
REMARKS :
I. PRELIMINARY CHECK
Site Electrical / Mechanical Check
ITEM TO BE CHECKED STATUS Remark
Electrical Supply OK NOK NA
Site / Tower Grounding OK NOK NA
Site left clean & tidy OK NOK NA
Shelter Type Shelter (Indoor) Shelter Less (Outdoor)
Outdoor Shelter’s FAN is working normally (*) OK NOK NA
* For site shelter less only
Table 2
VDC Supply
Test Item Remark
(-24 VDC / -48VDC)
Input DC power MW
By Switch off the DC breaker at DCPDB or
Power Redundancy test OK NOK NA rectifier. Label must be attached
Synchronization
Clock Synchronization Role Master Slave
Primary Free Run Osc. E1/T1 (Port Nbr …….) Sync-In Port Radio Port Sync-E
Clock Source
Secondary Free Run Osc. E1/T1 (Port Nbr …….) Sync-In Port Radio Port Sync-E
Loopback Check
MEASUREMENT Refer to
ATP
ITEM TEST SPECIFICATION
Main Standby Paragraph
Internal (Core
OK NOK NA
Facing) Loopback Working
For MSS1/4/8
Normally
4.20
External (Radio
OK NOK NA
Facing) Loopback
Line Side Loopback OK NOK NA
Working
For MSS-1c Radio Side Normally
4.20
OK NOK NA
Loopback
Indoor Equipment Composition & Alarm Status
Slot
No.
Module / Card Type Part Number Serial Number Alarm Status
1 MSS-8 3DB18485EAAA01 VG182090070 OK NOK NA
2 MSS/CORE-MAIN 3DB19318BAAA01 TH1827Q013J OK NOK NA
3 MSS/EASv2 3DB19017ABAF01 TH1828Q038W OK NOK NA
4 MSS/EASv2 3DB19017ABAF01 TH1828Q0360 OK NOK NA
5 MSS/E1 3DB18126AEAD02 TH1803Q00TN OK NOK NA
6 MSS/E-FANS 3EM23911BBAB01 TH1829Q00FG OK NOK NA
7 OK NOK NA
8 OK NOK NA
OK NOK NA
OK NOK NA
OK NOK NA
III. NMS SUPERVISION
III.1. IP Address / Networking
Local NE IP Address 10.158.76.136
Local 7.1 /
MNGMT Port IP 10.158.67.37
Address 7.2
Subnet Mask 255.255.255.252
III.2. ROUTING
IP Static Routing Configuration*
IP Destination Subnet mask Gateway
Interface Pointer
Interface OSPF Area
TMN Management Ethernet 0.0.0.34
Port 4TMN Ethernet NA
Modem/MPT Access/EAS - Direction 1 0.0.0.34
Modem/MPT Access/EAS - Direction 2 NA
Modem/MPT Access/EAS - Direction 3 NA
Modem/MPT Access/EAS - Direction 4 NA
Link Identification
Station 130153_SAMBIREJO GAMPENGREJO KEDIRI
Link Name
Direction 130151_YONIF 521 KEDIRI
Allocation :
Main Ch. Slot3 Slot4 Slot5 Slot6 Slot7 Slot8
Modem300
MPT Access
EAS Card
Standby Ch. Slot3 Slot4 Slot5 Slot6 Slot7 Slot8
Diameter
Type Height (m) Part Number Serial Number Status
(m)
ANTENNA SYSTEM
SCX2-127BB 0.6 33 1AF27352AAAA 101129449-F005 OK NOK
CHECKING
Single Polarization Dual Polarization
Polarization : Vertical Horizontal Used BOTH = V & H
Frequency band 7 / 8 GHz 11 GHz 13 GHz 15 GHz 23 GHz
Protection Test
Refer to
MEASUREMENT ATP
ITEM TEST SPECIFICATION Paragraph
Main (Primary) Standby (Secondary)
Equipment
(EPS)
Working Normally OK NOK NA OK NOK NA
Link Protection
(Switching 1+1)* Tx Radio (TPS) Working Normally OK NOK NA OK NOK NA 2.5 / 2.11
Rx Radio (RPS) Working Normally OK NOK NA OK NOK NA
Core Board Protection Working Normally OK NOK NA 2.12
(*) For Configuration 1+1 HSB only
BER Circuit / Ethernet & Link Performance Checks
MEASUREMENT Refer to
ITEM TEST SPECIFICATION ATP
P32E1 (1) / Flow Id Paragraph
1 = 9 = 17 = 25 =
2 = 10 = 18 = 26 =
3 = 11 = 19 = 27 =
4 = 12 = 20 = 28 =
No Error at each
E1 Tributary Test * 3.4 / 16
ports for 1 min.
5 = 13 = 21 = 29 =
6 = 14 = 22 = 30 =
7 = 15 = 23 = 31 =
8 = 16 = 24 = 32 =
Link Performance
No Error (24h) OK NOK 9
Monitoring
V. ATTACHMENT CHECKING
Total
Page
ITEM TO BE ATTACH STATUS Number
of Remark
Pages
Print out of Network Topology OK NA
3. Pemasangan ODU 2+0, abel + barcode 4. Pemasangan ODU 2+0, label + barcode
NA
9. Terminasi ground ODU di busbar tower + label 10. Pemasangan kabel ties pada sisi vertikal tray
11. Pemasangan kabel ties pada sisi horisontal tray 12. Pemasangan grounding kit + label
N/A
13. Terminasi kabel ground kit di busbar + label 14. Posisi masuknya kabel IF di FEP Shelter/SC. FEP SC
tidak perlu di Sealent, FEP Shelter harus di Sealant.
15. Posisi IDU tampak depan dari SC/rak 19” 16. Pemasangan kabel IF, ground IDU/Modem + label
17. Pemasangan kabel traffic, power IDU + label 18. Label IDU dan barcodenya
NA
19. Pemasangan kabel IF, ground, + label 20. Pemasangan terminal blok LSA + label
N/A
21. Pemasangan kabel power di Rectifier/DCPDB 22. Kondisi shelter/SC tempat IDU terpasang tampak
depan
NA
23. Foto SID + Red mark 24. Foto Ketinggian Antenna(pakai meteran)
Punch List
Link ID 130151_130153
Severity
Item No.
Plan Actual
Cosmetic
Clear Responsible Clear
Minor
Major
Description Supervisor
Date Group Date
Name : Name :
Date : Date :
Name : Name :
Date : Date :