You are on page 1of 5

Site Audit Check List Microwave

Date:
Region/ Site Name / Site ID: Facing to:
Checked by (Name/ Company):
Model/ Type: Configuration :
Tx1/ Rx1/ Pol Frequency: Link1 Performance (24 Hours):

Tx2/ Rx2/Pol Frequency: Link1 Performance (24 Hours):

Tx1/ Rx1 Power(Planned): Tx1/ Rx1 Power(Actual):


Tx2/ Rx2 Power(Planned): Tx2/ Rx2 Power(Actual):
I.P. Address1 / NE ID: I.P. Address2 /
Indoor Inspection
Forecasted
Descriptions OK NOK NA Remark Clearning Date
Room / Cabinet Clean after Installation
MW modem installation status and Labeling
MW Power Connection and Labeling from MW Side and rectifier side
LAN Connection to the RAN installation and Labeling
Optic Connection to the MUX installation and labeling
IF cable installation status installation and Labeling
MW Ground Connection/ MW Side and basbar Side
IF installation on Indoor Cable Ladder
Outdoor Inspection
OK NOK NA Remark
MW antenna installation status
Antenna arm support Installation Status for 1.2 Antenna and above
Flexible Waveguide Installation Status
ODU installation status
Antenna/ ODU mounting Installation
All IF connectors and IF grounding are isolated accordingly to the MW
standards with tape and water proof
Check IF Cable path fixation using clamps (every 1.5 m)
IF cable Labeling Antenna Side
IF cable Grounding / Antenna Side
IF Cable Grounding/ before the Bend in cable tray
IF Grounding/ before the bldg .entry
All screws of alignment elements are fixed & tighten.

INVENTORY
Tower and Outdoor Unit
Tower Height/ Type
Antenna1 Height (AGL)
Antenna1 Azimuth
Antenna 1/Model/ Size
Antenna2 Height (AGL)
Antenna 2 Azimuth
Antenna 2/Model/ Size
ODU1 Model/ SN
ODU2 Model/ SN
Remarks:

HW installation & comissoning check by


BEE Cable Representative:
Site Audit Check List Microwave
Date:
Region/ Site Name / Site ID: Facing to:
Checked by (Name/ Company):
Model/ Type: Configuration :
Tx1/ Rx1/ Pol Frequency: Link1 Performance (24 Hours):

Tx2/ Rx2/Pol Frequency: Link1 Performance (24 Hours):

Tx1/ Rx1 Power(Planned): Tx1/ Rx1 Power(Actual):


Tx2/ Rx2 Power(Planned): Tx2/ Rx2 Power(Actual):
I.P. Address1 / NE ID: I.P. Address2 /
Indoor Inspection

Descriptions OK NOK NA

Room / Cabinet Clean after Installation


MW modem installation status and Labeling
MW Power Connection and Labeling from MW Side and rectifier side
LAN Connection to the RAN installation and Labeling
Optic Connection to the MUX installation and labeling
IF cable installation status installation and Labeling
MW Ground Connection/ MW Side and basbar Side
IF installation on Indoor Cable Ladder
Outdoor Inspection
OK NOK NA
MW antenna installation status
Antenna arm support Installation Status for 1.2 Antenna and above
Flexible Waveguide Installation Status
ODU installation status
ODU Grounding
Antenna/ ODU mounting Installation
All IF connectors and IF grounding are isolated accordingly to the MW
standards with tape and water proof
Check IF Cable path fixation using clamps (every 1.5 m)
IF cable Labeling Antenna Side
IF cable Grounding / Antenna Side
IF Cable Grounding/ before the Bend in cable tray
IF Grounding/ before the bldg .entry
All screws of alignment elements are fixed & tighten.

INVENTORY
Tower and Outdoor Unit
Tower Height/ Type
Antenna1 Height (AGL)
Antenna1 Azimuth
Antenna 1/Model/ Size
Antenna2 Height (AGL)
Antenna 2 Azimuth
Antenna 2/Model/ Size
ODU1 Model/ SN
ODU2 Model/ SN
Remarks:
wave

Forecasted
Remark
Clearning Date

Remark
HW installation & comissoning check by
BEE Cable Representative:

You might also like