You are on page 1of 69

IRAQ_MICROWAVE LINK CHECK LIST_V1

# Site Information
1 SITE A ID
Bac
2 SITE B ID
3 LINK TYPE : kbo Edge
Term
4 SITE A NAMEne inal
5 SITE B NAMEsite
6 Site topology (GF/RT)
7 Site Type (ID/OD)
8 Site category
9 Region
10 Area
11 Company
12 Inspection Date
Conditi
13 Vendor Representativeonally
:
Conditi Rejec
14 Accep
BeeCable Inspectionaccept onally ted Rejec
# Confeguration Review ted
ed accept ted
1 Communication parameters ( NE ID,ed NE name, Link Name )
2 Link configuration Installed as per design (1+0, XPIC or 1+1SD )
3 The TX power according to the Link Budget
4 Commissioning parameters is same as Link Design ( Tx Freq. ,BW, Modulation Scheme )
5 Board and Modem installed as per Slot Layout design
All related documents are handed over to O&M
# Outdoor Installation
Actual anttena heights as per design ± 1.5m
Main in
1
Site A
Site B
2 There is a painting marking in the side arme
3 All screws of alignment elements are fixed & tighten with double nuts.
4 side arme are fixed and tighten with the correct and proper way.
5 Waveguides and ODU's are fixed correctly & Alignment unit and antenna screws are tightened with Iron hoop
6 Dish polarization correct according to the L.B. design
7 Grounding cables of ODU's, IF cable are correctly connected to the Bus bars (If available); Else on tower on paint scratched area.
8 All IF connectors and IF grounding are isolated accordingly to the MW standards with tape and water proof.
9 Check Microwave Componets Plastic Labeling fixed with weather proof tay rap
10 antennas ≥ 1.2m side strut is probably installed with 90° chronic angle
11 antennas ≥ 1.8m 2nd side strut is probably installed with 90° chronic angle
12 Grounding cables should laying toward ground & separately
13 Check IF & Power cables path fixation using clamps (every 1.5 m)
14 Verify MW RF cables connector tightining (IDU & ODU)
15 Check MW antenna installed with bracket or not & specify Antenna diamter
16 Label of IF cable at ODU connector is Plastic label
17 IF loop bending on tower with 0.6m
# Indoor Installation
1 Check Cable Entrance ROXTEC fixation , Isolation , Filling holes & earthing
2 No IF loops or cross inside the shelter & grounding for IF cables must to be beside ROXTEC
3 Check MW IDU & IF, Power & Ethernet cable arrangment & Labeling using Tie rap (every 30 cm)
4 IDU installed using 4 screws & properly installed & grounding
5 Check
Check Standard Equipment CB
Standard Equipment CB labeling
labeling inside
inside Rectifier
Rectifier // DC
DC box
box (For OD sites)
6 (If indoor site and more than 1 IDU )
7 Indoor Cabinet properly installed & grounding
8 IF installation in RTN without any cross with RTN slot
9 power connection for RTN most be from BLVD port M06 / S07
10 Ethernet systemization , lableing , connection from RTN to BBU
# Test : Visibility & Performance
1 1+1 links (HSB or SD ) Protection switching test.
2 RSL according to the Link Budget
3 XPD Value in case of XPIC Link
4 Link has no Active Alarms
5 alarms clearance and database alignment is done on existing management system platform (TX, ABisoIP / BSS, etc…)
Comments

Status Comments

Status Comments

Div in M

90° ± 25° for second side arm

Status Comments

Status Comments

±3dB
≥27dB