You are on page 1of 8

Project Name Relay Testing

EPESOL PVT LTD Customer Premier Camichal Industry


Service Dates 01.12.2020 to 02.12.2020
Report Description: Test Report of Generator Protection Relay of P343 for 7MW
Tested By: Mr. Usman Shareef, Mr. Abdul Waheed Witnessed By: Mr. Tasleem

1. Relay Test Set Information

Test Set Make Doble


Model F6150
Testing Date 02.12.2020

2. General data

Relay Designation P343


Model P343811E2M0380M
Make GE Alstom
Serial No. 35157948/10/20
Terminal Side CT Ratio 600/1 A
Neutral Side CT Ratio 600/1 A
Ground CT Ratio 100/1 A
Phase VT Ratio 11.5 kV/110 V

3. Current Metering
CT Applied Phase Currents (A) Measured Phase Currents (kA)
Sr.
Designation IA IB IC ΦA ΦB ΦC IA IB IC ΦA ΦB ΦC
1 Line Side CT 0.61 0.61 0.61 180 60 300 366.6 367.2 366.9 180 60 300
Neutral Side
2 0.61 0.61 0.61 0 240 120 366.8 367.8 367.2 180 60 300
CT

4. Ground Current Metering


Applied Ground Current (A) Measured Ground Current (A)
Sr.
IG ΦG IG ΦG
1 0.5 0 49.8 358.8
2 1.0 0 99.8 359.2

5. Voltage Metering
Applied Phase Voltages (V) Measured Phase Voltages (kV)
Sr.
VA VB VC VA VB VC
ΦA ΦB ΦC ΦA ΦB ΦC
(V) (V) (V) (kV) (kV) (kV)
1 63.5 63.5 63.5 0 240 120 6.348 6.335 6.327 0 240 120

6. Stator Differential (87G)


6.1 Trip Settings

Sr. Parameter Existing Setting


1 Is1 0.1 pu
2 Is2 1.2pu
3 K1 0%
4 K2 150%

Partner
1|Page
GE Energy
Project Name Relay Testing
EPESOL PVT LTD Customer Premier Camichal Industry
Service Dates 01.12.2020 to 02.12.2020
Report Description: Test Report of Generator Protection Relay of P343 for 7MW
Tested By: Mr. Usman Shareef, Mr. Abdul Waheed Witnessed By: Mr. Tasleem

6.2 Stability Test

I Applied at Line Side (A) I Applied at Neutral Side (A)


Sr. Status
IA Φ IB Φ IC Φ IA Φ IB Φ IC Φ
1 1.0 0 1.0 240 1.0 120 1.0 180 1.0 60 1.0 300 Stable

6.3 Pickup Accuracy

I Applied at Neutral Side (A) I Applied at Line Side (A)


Sr. Status
IA Φ IB Φ IC Φ IA Φ IB Φ IC Φ
1 0.0 0 0.0 0 0.0 0 0.1 0 0.1 240 0.1 120 Pickup
2 0.1 0 0.1 240 0.1 120 0.0 0 0.0 0 0.0 0 Pickup
6.4 Slope Verification

I Applied at Line Side (A) I Applied at Neutral Side (A) Slope


Sr. Status
IA Φ IB Φ IC Φ Ia Φ Ib Φ Ic Φ (%)
1.22
1 1.80 0 1.80 240 1.80 120 1.220 0 240 1.220 120 - Trip
0

6.5 Time Accuracy

I Applied at Terminal Side (Amp) I Applied at Return Side (Amp) Time


Sr.
IA Φ IB Φ IC Φ Ia Φ Ib Φ Ic Φ (ms)
1 0.0 0 0.0 0 0.0 0 1.22 0 1.22 240 1.22 120 17.1
2 1.22 0 1.22 240 1.22 120 0.0 0 0.0 0 0.0 0 17.5

7. Phase Under voltage (27P)


7.1 Stage 1 Settings

Sr. Parameter Existing Setting


1 Pickup 85V
2 Delay 1.0s
3 Curve Element Definite Time
7.2 Pickup Accuracy

Applied Voltage (V)


Sr. Status
VA VB VC ΦA ΦB ΦC
1 49.04 49.04 49.04 0 240 120 No Pickup
2 49.05 49.05 49.05 0 240 120 Pickup
7.3 Time Accuracy

Applied Voltage (V) Time


Sr.
VA VB VC ΦA ΦB ΦC (s)

1 48.0 48.0 48.0 0 240 120 1.03

Partner
2|Page
GE Energy
Project Name Relay Testing
EPESOL PVT LTD Customer Premier Camichal Industry
Service Dates 01.12.2020 to 02.12.2020
Report Description: Test Report of Generator Protection Relay of P343 for 7MW
Tested By: Mr. Usman Shareef, Mr. Abdul Waheed Witnessed By: Mr. Tasleem

8. Phase Overvoltage (59P)


8.1 Trip Settings

Sr. Parameter Existing Setting


1 Pickup 121 V
2 Delay 2.0s

8.2 Pickup Accuracy

Applied Voltage (V)


Sr. Status
VA VB VC ΦA ΦB ΦC
1 69.8 69.8 69.8 0 240 120 No Pickup
2 69.9 69.9 69.9 0 240 120 Pickup

8.3 Time Accuracy


Applied Voltage (V) Time
Sr.
VA VB VC ΦA ΦB ΦC (s)

1 75.5 75.5 75.5 0 240 120 2.04

9. Under Frequency (81U)

9.1 Stage 1 Trip Settings

Sr. Parameter Existing Setting


1 Pickup 48.00 Hz
2 Delay 3.0s

9.2 Pickup Accuracy

Applied Voltage (V) Frequency


Sr. Status
VA VB VC ΦA ΦB ΦC (Hz)
1 63.5 63.5 63.5 0 240 120 48.10 No Pickup
2 63.5 63.5 63.5 0 240 120 48.0 Pickup

9.3 Stage 2 Trip Settings

Sr. Parameter Existing Setting


1 Pickup 47.5 Hz
2 Delay 3.0s

Partner
3|Page
GE Energy
Project Name Relay Testing
EPESOL PVT LTD Customer Premier Camichal Industry
Service Dates 01.12.2020 to 02.12.2020
Report Description: Test Report of Generator Protection Relay of P343 for 7MW
Tested By: Mr. Usman Shareef, Mr. Abdul Waheed Witnessed By: Mr. Tasleem

9.4 Pickup Accuracy

Applied Voltage (V) Frequency


Sr. Status
VA VB VC ΦA ΦB ΦC (Hz)
1 63.5 63.5 63.5 0 240 120 47.51 No Pickup
2 63.5 63.5 63.5 0 240 120 47.50 Pickup

9.5 Time Accuracy

Applied Voltage (V) Applied Frequency Time


Sr.
VA VB VC ΦA ΦB ΦC (Hz) (s)
1 63.5 63.5 63.5 0 240 120 46.5 3.18

10. Over frequency (81O)


10.1 Stage 1 Trip Settings

Sr. Parameter Existing Setting


1 Pickup 51.75 Hz
2 Delay 2.5 s
10.2 Pickup Accuracy

Applied Voltage (V) Frequency


Sr. Status
VA VB VC ΦA ΦB ΦC (Hz)
1 63.5 63.5 63.5 0 240 120 51.74 No Pickup
2 63.5 63.5 63.5 0 240 120 51.75 Pickup

Note: verified the 81-O alarm status.


10.3 Stage 2 Trip Settings

Sr. Parameter Existing Setting


1 Pickup 52.0 Hz
2 Delay 3.0s

10.4 Pickup Accuracy

Applied Voltage (V) Frequency


Sr. Status
VA VB VC ΦA ΦB ΦC (Hz)
1 63.5 63.5 63.5 0 240 120 51.9 No Pickup
2 63.5 63.5 63.5 0 240 120 52.0 Pickup

Partner
4|Page
GE Energy
Project Name Relay Testing
EPESOL PVT LTD Customer Premier Camichal Industry
Service Dates 01.12.2020 to 02.12.2020
Report Description: Test Report of Generator Protection Relay of P343 for 7MW
Tested By: Mr. Usman Shareef, Mr. Abdul Waheed Witnessed By: Mr. Tasleem

10.5 Time Accuracy

Applied Voltage (V) Applied Frequency


Sr. Time
VA VB VC ΦA ΦB ΦC (Hz)
1 63.5 63.5 63.5 0 240 120 52.1 3.15

11. Loss of Excitation (40)

11.1 Circle 1 Trip Settings

Sr. Parameter Existing Setting


1 Xa1 5.51 Ω
2 Xb1 184 Ω
3 Delay 3.00s

11.2 Lower Boundary Pickup Accuracy

Applied Voltages (V) Applied Current (A)


Sr. Status
VA Φ VB Φ VC Φ IA Φ IB Φ IC Φ
1 63.5 0 63.5 240 63.5 120 0.355 90 0.355 330 0.355 210 No Pickup
2 63.5 0 63.5 240 63.5 120 0.356 90 0.356 330 0.356 210 Pickup

11.3 Upper Boundary Pickup Accuracy

Applied Voltages (V) Applied Current (A)


Sr. Status
VA Φ VB Φ VC Φ IA Φ IB Φ IC Φ
1 1.03 0 1.03 240 1.03 120 1.0 90 1.0 330 1.0 210 No Pickup
2 1.03 0 1.03 240 1.03 120 1.0 90 1.0 330 1.0 210 Pickup

11.4 Time Accuracy

Applied Voltages (V) Applied Current (A) Time


Sr.
VA Φ VB Φ VC Φ IA Φ IB Φ IC Φ (s)
1 63.5 0 63.5 240 63.5 120 0.356 90 0.356 330 0.356 210 3.05
2 1.1 0 1.1 240 1.1 120 1.0 90 1.0 330 1.0 210 3.05

12. Negative Phase Sequence


Sr. Parameter Existing Setting
1 Alarm 80mA
2 Trip 100mA
3 Delay 3.00s

Partner
5|Page
GE Energy
Project Name Relay Testing
EPESOL PVT LTD Customer Premier Camichal Industry
Service Dates 01.12.2020 to 02.12.2020
Report Description: Test Report of Generator Protection Relay of P343 for 7MW
Tested By: Mr. Usman Shareef, Mr. Abdul Waheed Witnessed By: Mr. Tasleem

13. Negative Phase Sequence Pickup Accuracy


Applied Current (A)
Sr. Status
IA Φ IB Φ IC Φ
1 0.79 240 0.79 0 0.79 120 No Pickup
2 0.80 0 0.80 120 0.80 240 Pickup

13.1 Time Accuracy


Applied Current (A) Time
Sr.
IA Φ IB Φ IC Φ (s)
1 0.80 20 0.80 120 0.80 240 23.66

14. System Backup


Sr. Parameter Existing Setting
1 Pickup 1.0
2 Delay 2.0 s

14.1 Pickup Accuracy

Applied Voltages (V) Applied Current (A)


Sr. Status
VA Φ VB Φ VC Φ IA Φ IB Φ IC Φ
1 63.5 0 63.5 240 63.5 120 0.9 0 0.9 240 0.9 120 No Pickup
2 63.51 0 63.51 240 63.51 120 1.0 0 1.0 240 1.0 120 Pickup

14.2 Time Accuracy

Applied Voltages (V) Applied Current (A) Time


Sr.
VA Φ VB Φ VC Φ IA Φ IB Φ IC Φ (s)
1 63.51 0 63.51 240 63.51 120 1.1 0 1.1 240 1.1 120 2.03

15. Low Forward Power Settings


Sr. Parameter Existing Setting
1 Pickup 11.6 secondary
2 Delay 2.0 s
3 CB Status Close
4 Shutup Valve Close

Partner
6|Page
GE Energy
Project Name Relay Testing
EPESOL PVT LTD Customer Premier Camichal Industry
Service Dates 01.12.2020 to 02.12.2020
Report Description: Test Report of Generator Protection Relay of P343 for 7MW
Tested By: Mr. Usman Shareef, Mr. Abdul Waheed Witnessed By: Mr. Tasleem

15.1 Pickup Accuracy

Applied Voltages (V) Applied Current (A)


Sr. Status
VA Φ VB Φ VC Φ IA Φ IB Φ IC Φ
1 63.5 0 63.5 240 63.5 120 0.060 0 0.060 240 0.060 120 No Pickup
2 63.5 0 63.5 240 63.5 120 0.059 0 0.059 240 0.059 120 Pickup

15.2 Time Accuracy

Applied Voltages (V) Applied Current (A) Time


Sr.
VA Φ VB Φ VC Φ IA Φ IB Φ IC Φ (s)
1 63.5 0 63.5 240 63.5 120 0.05 0 0.05 240 0.05 120 2.03

16. Volt per Hertz


Sr. Parameter Existing Setting
1 Volt Per Hertz Enabled
2 Alarm Pickup 2.35
3 Trip Pickup 2.41
4 Delay 1.0 sec

16.1 Stg-1 Alarm Pickup Accuracy

Applied Voltages (V)


Sr. Status
VA Φ VB Φ VC Φ
1 67.8 0 67.8 240 67.8 120 No Pickup
2 67.9 0 67.9 240 67.9 120 Pickup

16.2 Stg-2 Trip Pickup Accuracy

Applied Voltages (V)


Sr. Status
VA Φ VB Φ VC Φ
1 69.8 0 69.8 240 69.8 120 No Pickup
2 69.9 0 69.9 240 69.9 120 Pickup

16.3 Time Accuracy : Frequency 50Hz

Applied Voltages (V)


Sr. Time(Sec)
VA Φ VB Φ VC Φ
1 70.0 0 70.0 240 70.0 120 1.03

17. Accidental Energization (27/50)


17.1 Trip Settings

Sr. Parameter Existing Setting


1 O/C Pickup 0.1 A
2 U/V Pickup 80 V

Partner
7|Page
GE Energy