Approved by,

CONTRACTOR DAILY OVERTIME


REPORT
DATE : 21-Sep-22 Galeh Hendra S Nasrullah Dedy S Satriya Stefan A.
No : 21/19/9/SPKL/MEI/22
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

1 91100445 Bangbang ETP Mr. Wagi 16:00 18:00

2 91100378 Hariyanto ETP Mr. Wagi 16:00 18:00

1. Pullback dan perapihan kabel algas untuk space pondasi


3 91100409 Septa ETP Mr. Wagi 16:00 18:00 2. Buat supoort untuk belmer
3. Pasang motor blower balingpress

4 91100280 Adi A ETP Mr. Wagi 16:00 18:00

5 91100327 Aji S ETP Mr. Wagi 16:00 18:00

6 91100331 Hendra PM 1.2 Mr. Wandi 16:00 18:00

7 91100352 Toni W PM 1.2 Mr. Wandi 16:00 18:00 Penurunan panel ex reliance drive pm untuk scrap
Penurunan panel ex reliance drive pm untuk scrap
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

8 91100322 Rasikun PM 1.2 Mr. Wandi 16:00 18:00


Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

1. Daily cek AVS panel dan motor drive PM1/2 & finishing
9 91100308 JanaTri PM 1.2 Mr. Eko 1:00 2:00 2. Input data
3. Maruishi cutter sensor error risete seting ok

1. Daily cek AVS panel Drive pm1, 2 juga Finising


10 91100346 Sukirno PM 1.2 Mr. Wisnu 18:00 19:00 2. Inspection & Cek temperatur Motor pm1, 2 & Finising
3. Input data AVS

11 91100323 Tommi A SP 1.2 Mr. Kukuh 16:00 18:00

1.cek crean dan Amper


2.cleaning motor
12 91100350 Khoirul Muflihun SP 1.2 Mr. Kukuh 16:00 18:00
3.pasang chain blok dan sper tool untuk ganti motor

13 91100403 Nasrullah SP 1.2 Mr. Kukuh 16:00 18:00

14 91100417 M Dhiyauddin SP 1.2 Mr. Gilang 16:00 18:00

1.Prepare Shapot lampu rotary dan alarm safety area Drumpulper


2.pulling cable CN15 DP

15 91100418 Ramdani SP 1.2 Mr. Gilang 16:00 18:00

1. M-B-1 trip over load, cleaning thickner


16 91100438 Refli Hamdan PM 3.7 Mr. Arif 1:00 2:00 2. SR-36 amankan module starter guna cleaning screen oleh produksi
3. Awal shift monitoring sheet break PM7, dari awal shift kertas putus. Masih
mengatasi semprot broke size press penuh
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

Mr. Amirul,
17 91100411 A. Samsul H PM 5.8 16:00 18:00
Mr. Adis

1. Instalasi kabel load Cell pm5 tarik kabel power 220 ke box amplifier, install
Mr. Amirul,
18 91100377 Galeh R PM 5.8 16:00 18:00 amplifier ABB
Mr. Adis
2. Perapihan kabel untuk instalasi ke box amplipier panel ke 2

19 91100446 Gani Nata A PM 5.8 Mr. Amirul, 16:00 18:00


Mr. Adis