The contractor daily overtime report from 29-Oct-22 lists 3 employees who worked overtime that day:
Sukirno from the PM 1.2 department worked from 1-2 PM performing various maintenance tasks. Sigit Priyanto from PM 3.7 worked from 6-7 PM cleaning and monitoring equipment. Aldino Eka from PM 3.7 worked from 1-2 PM activating and deactivating a SP 3 module and checking that a P-84 module was unavailable due to repairs.
The contractor daily overtime report from 29-Oct-22 lists 3 employees who worked overtime that day:
Sukirno from the PM 1.2 department worked from 1-2 PM performing various maintenance tasks. Sigit Priyanto from PM 3.7 worked from 6-7 PM cleaning and monitoring equipment. Aldino Eka from PM 3.7 worked from 1-2 PM activating and deactivating a SP 3 module and checking that a P-84 module was unavailable due to repairs.
The contractor daily overtime report from 29-Oct-22 lists 3 employees who worked overtime that day:
Sukirno from the PM 1.2 department worked from 1-2 PM performing various maintenance tasks. Sigit Priyanto from PM 3.7 worked from 6-7 PM cleaning and monitoring equipment. Aldino Eka from PM 3.7 worked from 1-2 PM activating and deactivating a SP 3 module and checking that a P-84 module was unavailable due to repairs.
No : 29/03/10/SPKL/MEI/22 Photo No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description Before After 1. Daily cek motor dan panel drive Pm1/2 dan finishing 2. Input data AVS 3. Melatani pemadaman dan pengaktifan panel drive area 1 91100346 Sukirno PM 1.2 Mr. Wisnu 1:00 2:00 fhinishing 4. Cek shower dan ganti 1 set shower area former 5 weat and Pm1 6. Bongkar panel ex relience pm2 1.Cleaning HMI PM7. 2.Monitoring temperature SHP & PAP PM7. 2 91100351 Sigit Priyanto PM 3.7 Mr. Arif 18:00 19:00 3.Cleaning motor dryer 6 ppr. 4.Monitoring M-Clean beam 4
1. Pengaktifan dan pemadaman modul SP 3 PM 3.
3 91100443 Aldino Eka PM 3.7 Mr. Sartika 1:00 2:00 2. Info produksi P-84 tidak bisa dijalankan, cek modul sedang dalam perbaikan.