CONTRACTOR DAILY OVERTIME


REPORT
DATE : 29-Jun-22 Donalson L Adi Anwar M. Ayub Stefan A.
No : 29/12/6/SPKL/MEI/22
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

1.daily cek motor pm1&pm2


1 91100352 Toni W PM 1.2 Mr. Wandi 16:00 18:00 2.test motor ex dryer 2
3.merapihkan kabel bekas d omc

Shift 1
'1. Daily Check & Record Electric Consumption PM#1
2 91100308 JanaTri PM 1.2 Mr. Eko 3:00 4:00
& PM#2.
2. Inspection Electrical PM#2_Shift1,

Shift 1
3 91100418 Ramdani SP 1.2 Mr. Agus 3:00 4:00
'1. Daily Check & Record Electric Consumption
PM1 & PM2.
2. Inspection Electrical 1/2 Shift1.

Shift 3
4 91100417 M. Dhiayuddin SP 1.2 Mr. Abbas 18:00 19:00
'1. Daily Check & Record Electric Consumption
PM1 & PM2.
2. Inspection Electrical 1/2 Shift3.

5 9110280 Adi Anwar ETP Mr. Bisma 16:00 18:00

fabrikasi support tray enfulentank

6 91100386 M. Suwandi ETP Mr. Bisma 16:00 18:00


Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

7 91100400 Tomo S ETP Mr. Bisma 16:00 18:00

8 91100380 Septa I ETP Mr. Bisma 16:00 18:00 fabrikasi support tray enfulentank

9 91100327 Aji S ETP Mr. Bisma 16:00 18:00

1.daily cek motor pm1&pm2


10 91100312 A. Tawapi PM 1.2 Mr. Wandi 16:00 18:00 2.test motor ex dryer 2
3.merapihkan kabel bekas d omc

1.daily cek motor pm1&pm2


11 91100322 Rasikun PM 1.2 Mr. Wandi 16:00 18:00 2.test motor ex dryer 2
3.merapihkan kabel bekas d omc

1.daily cek motor pm1&pm2


12 91100382 Donalson L PM 1.2 Mr. Wandi 16:00 18:00 2.test motor ex dryer 2
3.merapihkan kabel bekas d omc

Mr.
13 91100343 Pirid SP 1.2 16:00 18:00 Scrube kabel dan clean area OMC
Sayiddin