Page :

' PROJECT NAME ' Inspect Date :

LIGHTNING INSPECTION REPORT

CLIENT : REPORT NO :
SYSTEM : REFF. DRAWING :
AREA : INSPECTION TYPE : VISUAL INSPECTION

NO INSPECTION CHECK YES NO N/A REMARKS


Check that lightning system is installed in compliance with approved construction
1
drawings.
Check lightning connections for materials (galvanized, stainless, brass, copper, welded
2
etc.), tightness.

3 Check lightning rod & grounding cable which supplied as per design.

Check for proper support for lightning rod and mechanical protection/clamp for the
4
grounding cables.
Check lightning installation for location and level in compliance with approved
5
construction drawings.

6 Check of earthing rod installed to correct length

7 Check connection grounding cable to grounding rod or grounding mesh

8 Measurement of resistance value

Prepared & Inspected by Inspected by PT PP Accepted by Client


Subcontractor

Name
Date