' PROJECT NAME ' Inspect Date :

ABOVE GROUND CONDUIT INSPECTION REPORT

CLIENT : REPORT NO :
SYSTEM : REFF. DRAWING :
AREA : INSPECTION TYPE : VISUAL INSPECTION

NO INSPECTION CHECK YES NO N/A REMARKS

1 Supports and spacing are per specification and drawings

2 Supports adjacent to terminal fittings


Conduits are clean, stub-ups projected, open ends plugged and
3
damages incurred during construction are repaired
Field bend radius correct per specification and codes. Bends are free
4
from deformities
5 Expansion joints are in accordance to drawing

6 Installation is neat and pipes are evenly spaced


Spacing between instrument and power conduit is in accordance
7
with specification
Spacing from hot (insulated) pipes and from hot surface maintained
8
in accordance with project specification
Conduits permanently and effectively grounded, unless specification
9
permits otherwise
Proper fittings installed with threads fully engaged, no wrench cuts,
10
conduit ends have bushing and cover installed
11 Seals and drains installed in accordance with drawings
Aluminum, PVC or PVC-coated conduits installed when specificed
12
in drawings
Flexible conduits installed with proper bending radius and with
13
standard fittings
Junction boxes levelled and supported as per drawings with proper
14 hubs, locknuts and bushing installed. Junction boxes properly
identified

Prepared & Inspected by Inspected by PT PP Accepted by Client


Subcontractor
Name
Date