COMMISSIONING CHECK SHEET FOR SPRINKLER + WET BOOSTER Sheet No.


SET

SUBCONTRACTOR:

EQUIPMENT NO. : SEQUENCE NO. :


SERIAL NO. : DATE :
LOCATION : COMMISSIONED ON :

Checked
ITEM POINTS TO BE CHECKED by REMARKS
1 Pipe line tested.
2 AVVs are installed.
3 Supply voltage matches with motor rating.
4 Tightness of electrical connections.
5 Control wiring is properly done.
6 Mounting arrangement for proper operation on
vibration isolating springs.
7 Pump motor alignment.
8 Pressure vessel properly charged.
9 By pass line to tank provided.
10 Raw water tank filled up.
11 Non return valve installed.
12 Overload setting and fuse rating.

THE ABOVE POINTS HAVE BEEN CHECKED AND FOUND TO COMPLY WITH
CONTRACT SPECIFICATIONS.

CHECKED BY SUBCONTRACTOR: _____________________


Signature

WITNESSED BY CLIENT: ______________________


Signature

WITNESSED / ACCEPTED BY CONSULTANT: ____________________


Signature