You are on page 1of 2

Page :

' PROJECT NAME ' Inspect Date :

POWER TRANSFORMER REPORT

REF. DWG : REPORT NO :


CAPACITY : MANUFACTURER :
COOLING : SERIAL NO. :
VOLTAGE : HV V VECTOR GROUP :
LV V FREQUENCY : HZ

NO INSPECTION CHECK YES NO N/A REMARKS


Compare nameplate data with approved documents/drawings and confirm no
1
deviation.
Compare rating plate data with approved documents/drawings and confirm no
2
deviation.
Check that preservation are in good conditions (no damage, no rust, no undue
3
accumulation of dust and dirt, no condensation etc.).

4 Check oil level and confirm no leakage.

5 Check transformer installation in accordance with approved construction drawings.

Check all transformer auxiliary equipment for proper installations in accordance with
6
approved vendor drawings.
Check cables for proper connections (no damage, within allowed cable bending
7
radius, proper cable supports, cable gland tightness and accessories).

8 Check that non-magnetic gland plates are provided for single core cables.

9 Check any missing fixing bolts for termination enclosures.

10 Check earthing and bonding in accordance with approved construction drawings.

11 Check silica gel in breathers satisfactory.

12 Check N2 gas pressure in the gauge satisfactory, if provided.

13 Confirm CT secondary wiring is shorted, if external connection is not provided.

14 Confirm CT secondary shorting link is removed, if external connection is provided.

Prepared & Inspected by Inspected by PT PP Accepted by Client


Subcontractor

Name
Date