Professional Documents
Culture Documents
Main Contractor
RENOVATION OF DAR AL
KUTUB
SR Checked by Checked by
ITEM DATE
#
S/C CONT. Consultant
3. Check that only properly fabricated fittings are used for change in directions,
shapes, sizes, and connections.
4. The joints and flanges are correctly made, jointed, and sealed (All transverse
joints and longitudinal seams ).
Check that duct joints are sealed externally before applying insulation with
5.
approval sealant.
6. Check fixing of supports and spacing as per approved drawings & submittal.
Check nuts, bolts, screws, brackets drop rods etc, are tight and aligned
10
properly.
All the access doors, fire dampers, VCD's, VAV etc. are installed as per
11 approved drawings specifications and manufacturer’s instructions as
applicable.
13 Ensure that the Identification & labeling are provided for duct works.
For S/C QA/QC: Date: For CONTRACTOR QA/QC: Date For Consultant Representative: Date: