FACILITIES MANAGEMENT
HARBOR BUILDINGS RECTIFICATION PROJECT
S. A. BAYTUR INSPECTION CHECKLIST
S.A. BAYTUR QA/QC DIVISION - 10-09-17 - REV.00
PROJECT TITLE Contract Number CONTRACTOR / SUBCONTRACTOR
LOCATION:
ACTUAL INSPECTION DATE & TIME WORK PERMIT
RFI-PLUMB-
/ / @ YES o NO o
ITEM
ACCEPTANCE CRITERIA PASS FAIL N/A RE-INSP DATE
No.
All insulation and finishes shall be installed according to the manufacturer’s
A1
recommendations.
A2 Verify that piping has been tested before applying insulation materials.
Verify that surfaces are clean from foreign material and dry prior to installing
A3
insulation.
A4 Insulation shall slip on pipes and not cut as far as applicable except on fittings.
Verify that insulation is continuous through walls, sleeves, pipe hangers, and
A6
other pipe penetrations.
Provide insulation protection shields on all insulated pipe between the pipe
insulation and the pipe support. Insulation shield shall be galvanized carbon
A7
steel ribbed shields gauge 18 designed to prevent damage to insulation by
support.
REMARKS:
REFERENCE DOCUMENTS:
1- Design Documents.
2- Construction Specifications Section 15260.
PERSON RESPONSIBLE FOR COMPLETION OF QUALITY WORK/TEST
NAME DATE SIGNATURE
Work is Complete and Ready for Inspection
SITE ENGINEER
Witnessed Hold
QC INSPECTOR
Witnessed Hold
KAUST HRP Representative