You are on page 1of 1

KING ABDULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGY

FACILITIES MANAGEMENT
HARBOR BUILDINGS RECTIFICATION PROJECT
S. A. BAYTUR INSPECTION CHECKLIST
S.A. BAYTUR QA/QC DIVISION - 10-09-17 - REV.00
PROJECT TITLE Contract Number CONTRACTOR / SUBCONTRACTOR

HARBOR BUILDINGS RECTIFICATION PROJECT CW6373 S.A.BAYTUR CONSTRUCTION CO.

LOCATION:
ACTUAL INSPECTION DATE & TIME WORK PERMIT
RFI-PLUMB-
/ / @ YES o NO o

SAB-IC-P-0103: INSTALLATION OF INSULATION ON HOT WATER PIPING SYSTEM

ITEM
ACCEPTANCE CRITERIA PASS FAIL N/A RE-INSP DATE
No.
All insulation and finishes shall be installed according to the manufacturer’s
A1
recommendations.

A2 Verify that piping has been tested before applying insulation materials.

Verify that surfaces are clean from foreign material and dry prior to installing
A3
insulation.

A4 Insulation shall slip on pipes and not cut as far as applicable except on fittings.

A5 Insulation thickness is as per project specification.

Verify that insulation is continuous through walls, sleeves, pipe hangers, and
A6
other pipe penetrations.

Provide insulation protection shields on all insulated pipe between the pipe
insulation and the pipe support. Insulation shield shall be galvanized carbon
A7
steel ribbed shields gauge 18 designed to prevent damage to insulation by
support.
REMARKS:

REFERENCE DOCUMENTS:
1- Design Documents.
2- Construction Specifications Section 15260.
PERSON RESPONSIBLE FOR COMPLETION OF QUALITY WORK/TEST
NAME DATE SIGNATURE
Work is Complete and Ready for Inspection
SITE ENGINEER

Witnessed Hold
QC INSPECTOR

Witnessed Hold
KAUST HRP Representative

Page 1 of 1