Professional Documents
Culture Documents
SBC/ITP/DOC/001,
REV 0 ITP NO. :
INSPECTION AND TEST PLAN REV.0
DATE 28.01.2019 ORIGINATOR : M Jeyakumar
PROJECT NO. JI-2033 APPROVED BY : Sriniwas Rao
ERECTION OF STRUCTURAL STEEL & SHEETING
DISCIPLINE MECHANICAL SIGNATURE :
AREA / LOCATION :
SIGNATURE: SIGNATURE:
DATE: DATE:
1|Page
SALALAH LPG PROJECT, OMAN
GALFAR SUB
GSC SC SUBCONTRACTOR EPCC EPC CONTRACTOR (PETROFAC E & C OMAN LLC) CPY COMPANY
CONTRACTOR
SIGN : SIGN :
0 REVIEW DATE : DATE :
NAME : NAME :
2|Page
SALALAH LPG PROJECT, OMAN
Anchor Bolt Tightening after Snug tighteming, Locknut, Washer, & Bolt Project Specification
7
Grouting cleanliness (Clause No.: 14.13)
1. Inspction Report Site Engineer H W S
General Notes:
1) Torque Values for the fastners are as per the approved drawings and Project specifications
SAMPLE REPORT
REMARKS:
Signature
Name
Designation
STEELBUILDINGS LLC
COLUMN ALIGNMENT REPORT
LOCATION: xxxxxxx DATE:xxxx
DRG NO: xxxxxxx
SAMPLE
OBSERVED RESULTS:
WORK
STEEL BUILDINGS LLC SC EPCC CPY
ACCEPTED
Signature
Name
Designation
GENERAL INSPECTION REPORT
Stages:
Others (Please
Receving In-Process Final
Specify):
Inspection On:
Item/Process
being Inspected:
Description :
Details of MME
Used (if any) :
Accepted
Signature
Name
Designation
Date
AREA STRUCTURAL COMPLETION CERTIFICATE
Name
Signature
Date
STRUCTURAL STEEL ERECTION INSPECTION RECORD
5
Foundation surface preparation is satisfactory
6
Positon and thickness of shims is satisfactory
7
steel surface assembly alignment is satisfactory
8
Bolts torqueing and marking is satisfactory
Final bolt tightening is satisfactory after
9
grouting
Name
Signature
Date