REQUEST FOR INSPECTION

(RFI)
CPF PHASE 2 AT BADRA OIL FIELD Page No. 1

PROJECT No: SG-2614 Discipline: PIPING RFI NO: 291-PI-IN-043

sub Contractor: SECL Area/Location: CPF/ SRU A-PA21 ID No:1-5-26

TAG No: C_255PM_02_0030 System/Sub-System No: N/A ITP Item No: 2.6

ITP / SPEC / DWG REF: GB090-2614-250-PI-PP-0023 Date of inspection: 12.02.2017

SUB Contractor SECL Construction

Submitted
N/A
Name/Date:
SECL QA/QC GAZPROM QA/QC

Time Received

Name/Date: Name/Date:

Inspection Time Point of Inspection


Description of Inspection & Test Type
Item Time Contractor Client

1 8.00 AM VISUALand physical INSPECTION FOR FIT-UP JOINT s s

Remarks

Acknowledgement (see remarks if any)


Results
SECL QA/QC GAZPROM

Acceptable
Name : Name :

Acceptable w/comments
Date : Date :

Not Acceptable (see NCR, TD)


Sign : Sign :
REQUEST FOR INSPECTION

(RFI)

RAS AL KHAIR ALUMINIUM SMELTER PROJECT


SECL Construction Discipline : CIVIL-PILING WORKS RFI No. : SS2434-CN-CV-PW-

Inspection Date: 13/09/2011

Precise Unit/Location: PORT

SECL Construction SECL QA/QC

Time Received
Name/Date: Name/Date:

Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client

Inspection For Rebar Cages of Coke Slio #3221


1 Hold Witness
(Pile No. 100)

Attachments

-
-
Remarks

-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC

Name : Name : Acceptable

Sign : Sign : Acceptable w/comments

Date : Date : Not Acceptable (see NCR, TD)


REQUEST FOR INSPECTION

(RFI)

RAS AL KHAIR ALUMINIUM SMELTER PROJECT


SECL Construction Discipline : CIVIL-PILING WORKS RFI No. : SS2434-CN-CV-PW-

Inspection Date: 13/09/2011

Precise Unit/Location: PORT

SECL Construction SECL QA/QC

Time Received
Name/Date: Name/Date:

Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client

Drilling And Concreting Of 1 pile at Coke Silo #3221


1 Hold Witness
(Pile No. 116)

Attachments

-
-
Remarks

-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC

Acceptable
Name : Name :

Acceptable w/comments
Sign : Sign :

Not Acceptable (see NCR, TD)


Date : Date :
REQUEST FOR INSPECTION

(RFI)

RAS AL KHAIR ALUMINIUM SMELTER PROJECT


SECL Construction Discipline : CIVIL-PILING WORKS RFI No. : SS2434-CN-CV-PW-

Inspection Date: 14/09/2011

Precise Unit/Location: PORT

SECL Construction SECL QA/QC

Time Received
Name/Date: Name/Date:

Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client

7 days compressive strength test for Specimen


1
Concrete Class M-1 for Tower Crane 1 - South Pile

Attachments

-
-
Remarks

-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC

Acceptable
Name : Name :

Acceptable w/comments
Sign : Sign :

Not Acceptable (see NCR, TD)


Date : Date :
REQUEST FOR INSPECTION

(RFI)

MA’ADEN SMELTER PORT FACILITY PROJECT


SECL Construction Discipline : CIVIL-PILING WORKS RFI No. : SS2434-CN-CV-PW-

Inspection Date: 11/09/2011

Precise Unit/Location: PORT

SECL Construction SECL QA/QC

Time Received

Name/Date: Name/Date:
Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client

Inspection For Rebar Cages Nosc(u) (5 Rebar Cages For


1
Coke Slio # 1

2 Inspection for Setting out 1 Points at(T/C 1#)

Attachments

-
-
Remarks

-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC

Acceptable
Name : Name :

Acceptable w/comments
Sign : Sign :

Not Acceptable (see NCR, TD)


Date : Date :