Professional Documents
Culture Documents
(RFI)
CPF PHASE 2 AT BADRA OIL FIELD Page No. 1
TAG No: C_255PM_02_0030 System/Sub-System No: N/A ITP Item No: 2.6
Submitted
N/A
Name/Date:
SECL QA/QC GAZPROM QA/QC
Time Received
Name/Date: Name/Date:
Remarks
Acceptable
Name : Name :
Acceptable w/comments
Date : Date :
(RFI)
Time Received
Name/Date: Name/Date:
Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client
Attachments
-
-
Remarks
-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC
(RFI)
Time Received
Name/Date: Name/Date:
Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client
Attachments
-
-
Remarks
-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC
Acceptable
Name : Name :
Acceptable w/comments
Sign : Sign :
(RFI)
Time Received
Name/Date: Name/Date:
Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client
Attachments
-
-
Remarks
-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC
Acceptable
Name : Name :
Acceptable w/comments
Sign : Sign :
(RFI)
Time Received
Name/Date: Name/Date:
Point of Inspection
Item No. Time Description of Inspection & Test Type
Contractor Client
Attachments
-
-
Remarks
-
-
Acknowledgement (see remarks if any)
Results
SECL QA/QC BECHTEL QA/QC
Acceptable
Name : Name :
Acceptable w/comments
Sign : Sign :